Pair.Complete handed the caller's context to the workstation unchanged, so a
remote that accepted the connection and then hung spent the whole turn budget.
The fallback then ran on an expired context and the floor returned the deadline
error instead of an answer, which broke the turn on the workstation being slow.
docs/offload.md rules that out. The remote now gets at most half of a deadline
that exists, and a context without a deadline is left to the configured
workstation timeout.
Pair.Stop and worker.Server.Close both closed their channel after a
check-then-close, so two concurrent callers could race and the second close
panics. Both are sync.Once now, which is what the doc comments already claimed.
config.Load names the environment variables it could not resolve. An unset
variable still expands to the empty string, because every block reads that as
not configured and CI parses deploy/mavend.json with no secrets present. What
was missing is the line telling the operator which capability a forgotten env
file just turned off.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Seven cases. The load-bearing ones are the constraint from 483: an
unconfigured deploy never probes and always reaches the floor, a busy
card degrades silently with the remote untouched, and a remote that dies
between probes still completes the turn and corrects the cached answer on
its way out.
CompleteRemote is pinned not to fall back, because a named gap that
quietly became a 1.7B guess is the failure this whole split exists to
prevent. And 1000 Available calls are pinned to make zero probes.