Commit Graph

3 Commits

Author SHA1 Message Date
kami ed9bdd5e09 Add the day plan she can recite when asked (#128)
The plan answers "какие планы на сегодня?" by putting one day in order:
calendar events (with #126's ambient provenance carried through and hedged),
pending reminders, and one line per morning routine that still has items
outstanding. "что дальше?" trims what has already passed.

It lives in internal/morning, not in a parallel system, because it is the same
question the checklist asks at a different scale — the routine knows what is
missing from a window, the plan knows what the whole day holds, and both read
the same facts and the same idea of "today". BuildPlan is pure; tickLoop.dayPlan
is the impure half that reads the store.

It is not a nag. Nothing here fires, schedules or announces: the plan is built
only when asked, over IPC (day_plan) or on the existing /morning page.
Unprompted delivery stays with the morning nudge and the dispatcher's policy.

The query source sits before "calendar" in querySources because both match
"…на сегодня" and the plan's matcher is the more specific one; IsDayPlanQuery
matches whole words so "планёрка" (a meeting) is not read as a request for the
plan, and refuses any utterance naming another day, since the plan is built for
the clock's own day only.

Verified: make build and make test both exit 0; new tests cover plan ordering,
the checklist-only-what-is-left rule, other-day rejection, the RU rendering
against the persona checks, rest-of-day trimming, the source ordering, and the
matcher's refusals.
2026-08-01 02:15:18 +04:00
kami 49f089d8a6 Read the work calendar as a notification signal, not a mailbox (#126)
Maven does not get a work credential. A corp mail or calendar session living on
the homelab ties the box's blast radius to the employer's data, which is the
thing this task exists to refuse. What she reads instead is the signal: an
Android notification-listener on the phone relays meeting notifications over
wg/LAN to POST /api/ambient, and the ones that clearly describe a meeting become
calendar events at source=ambient:notif, confidence 0.6.

The provenance is the point. A notification is evidence about a meeting, not a
reading of a calendar, so it is never indistinguishable from one: it is stored
below full confidence, store.CalendarEvents keeps the source and confidence on
every row it returns, and the query path hedges — "похоже, Планёрка @ 14:00" for
a relayed event, plain text for a CalDAV read.

The parse is deliberately conservative (internal/calendar/ambient.go). It needs
a real clock reading and a summary that is not just that clock reading;
otherwise it stores nothing at all. A bare hour is not a time, an unread count
is not a time, and "срок 2026.08.15" does not offer 08:15 as a meeting — loose
digits in a notification are far more often a badge or a date, and a mailbox of
noise rendered as invented meetings is worse than a gap.

The ingest is off unless configured: no -ambient-token, no route registered. The
token is a shared secret compared in constant time, because the poster is a
background Android service and WebAuthn has no answer for one. The endpoint is
write-only, accepts one shape of write, and cannot read anything back out.
Reposts of the same notification dedupe against the latest fact for that
key+source, the same append-only discipline cmd/mavcaldav follows.

Not shipped: the Android relay app itself, which is a separate artifact and a
device, not Go in this repo.
2026-08-01 02:04:06 +04:00
kami b4a3867479 Turn actionQuery into a chain of query sources
The six answer sources were hand-unrolled inside one 127-line function.
The intent table is a closed set of 7, but this list is open-ended —
Kiwix (#286), RSS (#258), the crawler (#259) and email (#246) each add
one. Each is now a registry entry: a name plus a method on the handler,
walked in order until one claims the question.

Order is unchanged and still load-bearing (memory before the notes-only
pass, #373), the confidence gate keeps its position and semantics, and
every reply string, log line and best-effort failure is verbatim.
2026-08-01 00:51:44 +04:00