4425ba112b
The plan named every open QA task on 02-08-2026 and had drifted since. V-492, the workstation offload, appeared nowhere in it, and neither did the word offload. It is now a sitting in session 3 with the three card states, the two things most likely to be wrong, and the one number the week is supposed to produce. Note that workpc is training today, so the held state is available and the free state is not. Fourteen ids the plan named closed on 04-08-2026. Only 282 was actually written into the text; it is gone, replaced by what remains, which is the desk_active units on workpc rather than the script. The header count is refreshed to 95 open and 35 QA, and now says to distrust itself, because that is the line that goes stale first. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>