Commit Graph

9 Commits

Author SHA1 Message Date
kami 32d15de034 refactor: merge cycle policy into semantic validation layer
Wire SemanticValidator into the production validator pipeline and
consolidate cycle-policy types under core:validation.

- Add SemanticValidator(CycleExitRule(requirePolicyForCycles=false))
  to the prod ValidationPipeline (no-op default, preserves behavior)
- Move CyclePolicy/Binding/Signature/Factory from core:transitions.policy
  to core:validation.policy (validation already owns ValidationContext)
- Rename CyclePolicyBindingRule -> CycleExitRule (issue code unchanged)
- Delete dead CyclePolicyResolver + PolicyValidation
2026-05-30 12:57:01 +04:00
kami 3b24c7e91a feat: shell execution correctness + artifact_field_equals condition
- Add  field to ProcessResultArtifact ("success"/"failed")
- Materialize ToolResult.Failure as a failed ProcessResult artifact
  in the orchestrator, with artifact lifecycle events emitted
- Non-recoverable ToolResult.Failure now fails the stage ("FATAL:")
  instead of being silently fed back as LLM context
- Fix enterStage to return Continue on non-retryable failures,
  enabling back-edge transitions (fix/retry loops)
- Add ArtifactFieldEquals transition condition with flat and
  nested dot-notation field access + FieldOperator enum
  (eq, neq, gt, gte, lt, lte)
- Wire artifact_field_equals through ConditionFactory and
  TomlWorkflowLoader (condition_field, condition_operator)
- Cache ProcessResult artifact content for evaluation context
- Add 16 tests covering all condition operators and error cases
- DefaultTransitionResolver catches condition evaluation errors
  and returns Blocked instead of crashing
2026-05-26 17:28:51 +04:00
kami f827685ed0 chore(damn): detekt, build, tests, formatting
fixed detekt issues where possible.
fixed disttar failing build because tools is added twice in the server module.
added workflowId where required.
fixed some tests not being recognized because of runBlocking without explicit return type.
formatting + imports.
2026-05-22 00:10:05 +04:00
kami 3365208d3a chore(cleanup): remove dead Module stubs and unused imports; restore deferred files
Deletes 21 Module.kt scaffolding objects that were never wired into any DI
registry. Removes unused imports across 8 production and 3 test files.

Restores StageExecutor, CyclePolicyResolver, PolicyValidation, and
ReplayContractTest — these are deferred features, not dead code.
2026-05-19 13:43:21 +04:00
kami 1c70511436 chore(cleanup): delete confirmed-dead files with no live references
Removes 6 files audited as fully unused: StageExecutor interface (shadowed
by kernel), CyclePolicyResolver and PolicyValidation (deferred cycle policy),
ApprovalRoutes (never registered), TuiNavigation (superseded by reducer),
and ReplayContractTest abstract class (no concrete subclasses).

ArtifactRelationshipType and CyclePolicy were audited but retained —
both are actively referenced by production code.
2026-05-19 12:55:27 +04:00
kami a5dc983a57 feat(workflow): typed produces slots — StageConfig uses TypedArtifactSlot, TOML accepts {name, kind} objects 2026-05-18 21:39:08 +04:00
kami 7d46f46f01 fix(server): event capturing and necessary logic for smoke test. 2026-05-17 03:21:42 +04:00
kami ce723afc8b refactor(imports): optimize imports 2026-05-17 03:19:57 +04:00
kami c77277af0b epic-12: after epic audit and init commit 2026-05-17 03:19:39 +04:00