kami edf00761fd Tell the planner what it was convened to fix
F66, found live on run 20. A replan reopens the plan phase and the session
it convenes was given the ordinary plan brief and an empty template: no
mention that a plan already exists, what contradicted it, which phase, what
evidence, or that its output supersedes an accepted plan. All of it was
already durable on PlanMismatchRecorded and none of it reached the agent,
so nothing stopped the replacement from sealing with the same
contradiction in it.

The contradiction is now projected onto the task and rendered above the
sealed artifacts, because it changes how they should be read. Its lifetime
is bounded at both ends: a sealed replacement answers it, and so does a
human reply to the stop it caused. Only the phases a mismatch can reopen
render it, since an implementer looks at the code rather than at an account
of the last contradiction.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
2026-08-29 20:47:44 +04:00
kami 1330ad9943 Stop reporting a blocker the task is no longer blocked on
F67. TaskCorrected cleared the standing question when a task resumed and
left Blocker and BlockReason in place, so task 29 ran through implement,
review and submission still reporting block_reason plan_mismatch. Every
surface that reads the projection rather than the event log showed a stop
that had already been answered.

The blocker has the same lifetime as the question beside it, and is now
cleared with it.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
2026-08-29 20:41:36 +04:00
kami 6cb2f932d8 Go and read the reply to a question Orchestra asked
F64. A plan mismatch that asks for a human decision blocks the task, and
nothing came back. Two independent gaps, either one enough to strand it:
the reconciler ran only before a lease and at a turn boundary, so a blocked
task's reply was never even read, and ResumeAnsweredBlockers listed two
block reasons, not this one. PlanMismatchAnswered had no caller anywhere.

Blocked tasks awaiting a reply are now reconciled on their own loop, the
same reasoning the submitted-work loop above it already uses: a task that
cannot be leased cannot be reconciled behind a pre-lease hook. One
predicate, BlockReasonAwaitsReply, now names the set for both loops so they
cannot drift apart again.

The existing test asserted the predicate and never the resume, which is how
this survived. It asserts the resume now, and fails without the fix.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
2026-08-29 19:57:11 +04:00
kami fb7135e1d9 Refuse a plan command outside project policy when the plan seals
The brief tells the planner "a command outside its policy is refused when you
seal, not later". It was not. The only caller of VerificationPolicy.Allows was
PlanPhaseCommands, which runs when the implementer asks to verify: one phase,
one session and one rotation after the planner could have fixed it.

Run 9 sealed ["bash", "scripts/test_healthcheck.sh"] against a policy that
allows neither shape, and the phase request was accepted.

The check now runs beside citation resolution, on the coordinator, where the
project is already in scope. A project with no verification policy can still
seal a plan; it cannot seal one that declares run: lines, which matches what
an absent policy already meant at verification time.

Test fixtures gained a policy for the same reason.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
2026-08-28 15:27:39 +04:00
kami c76112a309 Make a contradicted plan a typed report, and the reopen Orchestra's
An implementer that finds the plan contradicted by the code had two options,
both bad: work around it silently, or improvise a different plan inside the
phase meant to execute one. PlanMismatch is the third.

The report carries an observation and nothing else. It may not propose a
replacement plan, because writing the next plan is the planning phase's work.
requested_action stays advisory: replan, research, or human_decision is a
recommendation, and Orchestra decides.

Staleness is checked before anything is recorded. A report names the plan ref
and the commit it was written against, both filled by the worker from what it
can verify rather than from what the agent asserted. A report against an older
plan says nothing about the current one, and one against an older tree may
already be fixed. Neither is replayed.

The reducer keeps two things apart that are easy to conflate:

    mismatch recorded  !=  plan superseded

A plan stops being accepted only when a replacement is actually sealed, so an
abandoned replan leaves the accepted plan and its verified progress intact. On
a real re-seal the old ref moves to PlanHistory and its progress stops counting,
while the verification events stay in the log as provenance.

human_decision never reopens. It blocks with a packet stating what was observed
and what it contradicts, and a human answer can resolve the contradiction
without resealing anything: the plan, its progress and the phase all survive,
and the answer outranks the plan where they differ. Turning every ambiguity
into a replan would put the planner above the person who set the goal.

The backward edge is Orchestra's alone. CanReopenPhase is separate from
CanTransitionPhase, which every path validating an agent's request uses, so
phase-request.json still refuses a move back. An agent asks by reporting a
mismatch.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
2026-08-28 12:19:17 +04:00