An implementer that finds the plan contradicted by the code had two options,
both bad: work around it silently, or improvise a different plan inside the
phase meant to execute one. PlanMismatch is the third.
The report carries an observation and nothing else. It may not propose a
replacement plan, because writing the next plan is the planning phase's work.
requested_action stays advisory: replan, research, or human_decision is a
recommendation, and Orchestra decides.
Staleness is checked before anything is recorded. A report names the plan ref
and the commit it was written against, both filled by the worker from what it
can verify rather than from what the agent asserted. A report against an older
plan says nothing about the current one, and one against an older tree may
already be fixed. Neither is replayed.
The reducer keeps two things apart that are easy to conflate:
mismatch recorded != plan superseded
A plan stops being accepted only when a replacement is actually sealed, so an
abandoned replan leaves the accepted plan and its verified progress intact. On
a real re-seal the old ref moves to PlanHistory and its progress stops counting,
while the verification events stay in the log as provenance.
human_decision never reopens. It blocks with a packet stating what was observed
and what it contradicts, and a human answer can resolve the contradiction
without resealing anything: the plan, its progress and the phase all survive,
and the answer outranks the plan where they differ. Turning every ambiguity
into a replan would put the planner above the person who set the goal.
The backward edge is Orchestra's alone. CanReopenPhase is separate from
CanTransitionPhase, which every path validating an agent's request uses, so
phase-request.json still refuses a move back. An agent asks by reporting a
mismatch.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
A detailed plan that nothing enforces is a document. This makes the phases
executable: the implementer may write exactly one status, and every other
status is a conclusion Orchestra reaches by running the plan's own commands.
agent may request: ready_for_verification
agent may not assert: verified, awaiting_manual_verification, failed, skipped
The worker resolves commands from the coordinator, never from the request, so a
request cannot smuggle in a command the planner did not write. They run as argv
through exec with Dir set to the worktree, which is the quality gate's existing
envelope and not a weaker one. There is no shell, so a pipe is a literal
argument.
Project policy decides executable reach. registry.Project.Verification matches
argv positionally, and an absent policy refuses everything: a plan command is
agent-authored, so inheriting the operator-authored gate's reach by default
would be the wrong direction to fail in. A refused command is refused before
anything runs, and the refusal names the project and the command so the planner
learns its real reach.
Two bindings make the record mean something later. PlanRef, so progress earned
under plan A cannot survive into plan B. AtSHA, so "verified" does not outlive
the code that made it true: a record whose commit has moved is retained as
provenance and rendered as stale, never as a claim about the current tree.
Both are the same failure this codebase already fixed for reviews, which bind
to the commit they examined.
Manual steps hold a phase at awaiting_manual_verification. The sign-off is an
ordinary human decision whose subject carries the plan ref and the phase id, so
a later "looks good" on an unrelated thread cannot satisfy a gate nobody was
discussing.
A plan sealed before plan.md declares no executable unit, and says so: the
implement context states that phase progress is unavailable and the work
continues under the old semantics. Inventing phases it never had would be worse
than admitting it has none.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
F41, live on run 5: the review agent produced nothing after 02:12 and the
02:46 renewal was granted anyway. The progress digest covered Claude Code's
status footer, and one of its fields ticked inside the window. Reproduced the
worker's stored progress_sha byte for byte from the live pane, so the branch
taken was progress != ProgressSHA, not IsBusy and not an empty baseline.
PaneProgress now cuts from the editor's lower rule and trims the spinner
summary and version notice above it. AgentStatus still reads the raw capture,
so the busy markers living in the footer are unaffected.
Lease TTL moves to 5 minutes, from domain.LeaseTTL, with renewal at half of
it. Reclaiming a stalled pane happens only at expiry, and 30 minutes per
window made run 5's stall unbounded in practice.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
The brief told the agent to ask for a phase change and never carried the
asking. The agent asked in prose, no code represented the request, and the
session idled until its lease expired. That is what failed run 3.
F21. The agent asks with .orchestra/phase-request.json, and seals
research.json or plan.json where the phase it is leaving produces one. At a
verified turn boundary the worker checks the phase belief, the transition and
the artifact, then calls the coordinator with its lease epoch and a derived
operation id. AdvanceWorkPhase is unchanged, so a request cannot reach a move
the operator surface could not also make. Redelivery is idempotent.
F22. A session now records the phase it was launched to run. One that no
longer matches its task rotates with reason phase_changed, whether this worker
asked for the change or an operator made it.
F20. CLIAdapter.prompt sent handoff and rotation prompts without confirming
them, which is the failure F20 exists to catch. Fixed at the shared call site.
F23 needed no change. Issue comments already become decisions with no
submission, through Reconciler.Reconcile at PreLease and at every turn
boundary. The earlier finding searched internal/operations alone and was
wrong. Tests now cover the boundary it turns on.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_011xsXyr5J1RACo71YeKG3Pu
A task that reached the router's MaxAttempts was permanently terminal.
TaskReleased only ever increments Attempt, TaskCorrected could not touch it,
and no HTTP route emitted a correction at all. The only way to work an
exhausted issue again was to invent a second task for it, which defeats
(source, external_id) dedupe and abandons the task's own history.
POST /v1/tasks/{id}/retry, full-control surfaces only. It requires the task
to be failed, unleased, and failed with reason retry_limit: restoring a retry
budget is not an answer to a failure that was not the budget running out. The
effect is one TaskCorrected naming that failure, setting state queued and
attempt 0 and clearing next_retry_at, failure_class and last_error. Task id,
source pair, goal, acceptance, decisions, work phase and artifact refs all
stay, and the original failure events stay in the log.
operation_id is required and makes the call idempotent, so a repeated request
cannot reset an attempt that has since started running.
This is RetryTask, not a generic correction endpoint: arbitrary task mutation
over HTTP is a different and much larger authority. It also does not address
F9, which is an operator releasing a lease someone else owns.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
The API was in a restart loop, exiting with `invalid event: until_ns required`.
ValidateEvent compared until_ns against time.Now() for TaskLeased and
TaskLeaseRenewed, so a lease event that was valid when written failed validation
once it expired. store.Open replays the log tail after the snapshot and
log.Fatal's on the first invalid event, so the coordinator refused its own
history and could not start.
Validation of a durable event must be time-independent. Well-formedness is this
function's question; freshness belongs to Store.Lease and Store.ExpireLeases,
which compute until_ns themselves.
Latent since the field was introduced. It needed a renewal in the post-snapshot
tail plus a restart after that renewal expired.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
The v3 stack, previously an uncommitted working tree, plus this session's two
units and the burn-in instrument. This commit is the burn-in build identity:
coordinator and worker must both report this revision before a task is created.
Workflow (earlier sessions, uncommitted until now): human decision events and
reduction, source cursors and reconcile-before-launch, turn-boundary
reconciliation, internal/agentctx as the single renderer, ace-fca phases with
sealed artifacts, the trajectory gate, bounded grilling, independent review,
task pr enforcement, and human review reflection.
Capability restrictions at the agent boundary: an authz.Agent surface at
GatedWrite may ask and may not act. It also fixes two bugs the unit exposed --
gated surfaces could not reach the two endpoints written for them, and
RequestHumanDecision would block an unowned task while rejecting a question
from the session that did own it.
Turn-boundary reconcile-failure escalation: a streak of consecutive failures
asks the session to hand off, fenced on the lease epoch, with reconcile_failure
as a real handoff reason. The worker was dropping the coordinator's verdict on
the floor; it now acts on it.
Burn-in: herdr.WriteLaunchContext dumps the exact agentctx.Build result to
<worktree>/.orchestra/launch.md at every launch, local and federated. BURNIN.md
is the runbook. deploy/build.sh stamps both binaries from one commit.
go build, go vet and go test ./... pass, 20 packages.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Implements §3.1's invariant that a wrong event is never edited, only
compensated for by a new appended event. TaskCorrected references the
event it repairs and can change state and/or amend-style fields;
Store.Append verifies the referenced event actually exists on the task.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01W1rkJ2hBMybnJctPbcy4tT
Amendments to due/description/inherent_priority were accepted and durably
logged but silently discarded by the projection since store.apply only
ever handled the title key. Also added the missing Task.Description field
(TaskCreated never populated it either).
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01W1rkJ2hBMybnJctPbcy4tT
S5: Store.Lease and Store.ExpireLeases both set Event.ID to the task id, so
every TaskLeased/TaskReleased event for a given task collided on ID across
every lease of that task — unsound for ApplyAdvisory or any future
ID-based lookup. Both now call domain.NewID().
S6: Append's TaskCreated dedup path returned nil (success) without
appending anything. main.go's handler then did
`s.Events(0)[len(s.Events(0))-1]` and returned that — an unrelated event —
with 201 Created, and every other Append caller (Gitea poll/webhook, JSONL
ingest) had no way to distinguish "duplicate, as expected" from "genuinely
appended".
Add domain.ErrDuplicate, returned instead of nil on a duplicate
(source, external_id). Add Store.TaskBySource to resolve the
already-ingested task by that same dedup key. Update every caller:
- main.go's POST /v1/tasks now returns 200 with the existing task on
ErrDuplicate instead of fabricating a 201 with the wrong event.
- provider.Gitea.Poll/IngestWebhook and provider.JSONL.Ingest treat
ErrDuplicate as expected (already-seen issue/line), not a failure —
without this, Gitea polling would have errored out of its loop on the
first already-ingested issue in every batch, since Poll previously
relied on the old nil-on-dup behavior to keep scanning.
TestLeaseAndExpireEventIDsAreUnique and TestTaskBySourceResolvesDuplicate
cover the store-level fixes; TestAppendReplayAndDeduplicate updated for the
new error signal.
AUDIT.md S5, S6.
Pre-existing uncommitted work found at session start: rotation now emits
anchor_sha on TaskReleased (previously silently dropped by store.Append
validation), multi-repo Gitea provider support, per-project git worktree
roots, and associated test coverage. Committing as a checkpoint before
starting remediation work tracked in AUDIT.md.