Reconcile docs with reality; fix module graph, token compare, health #1

Open
kami wants to merge 216 commits from webui-and-audit-reconciliation into master
Showing only changes of commit 61442d801c - Show all commits
+9 -11
View File
@@ -46,19 +46,13 @@ path untouched.
| Half | Revision | Evidence |
|---|---|---|
| Coordinator, homesrv container | `bcaf0cc` | image `a5683b1869ae`, `/readyz` 200, embedded stamp checked |
| Worker, workpc systemd | **operator to install** | staged, see below |
| Worker, workpc systemd | `bcaf0cc` | installed 02:32:37, sha256 verified |
Branch `webui-and-audit-reconciliation`, HEAD `bcaf0cc`.
```text
revision bcaf0cc2851734f97105beb1cd608fda4e271964
sha256 7f2bee3d3c45a347d2f747b1aed624b3e45f8d255a47aaf710daad6fd10bc5d3
staged /home/kami/orchestra-deploy/orchestra-worker.bcaf0cc
```
```bash
sudo install -m 0755 /home/kami/orchestra-deploy/orchestra-worker.bcaf0cc /usr/local/bin/orchestra-worker
sudo systemctl restart orchestra-worker
```
**Confirm the installed worker checksum before believing anything else here.**
@@ -73,9 +67,13 @@ It is parked in `review`. The review agent finished at 02:12 and stopped,
correctly, because nothing had told it how to finish. That is F40, fixed in
`bcaf0cc` but not deliverable to a session that already has its brief.
The recovery is the lease expiring at `22:36:06Z` (02:36 local). The task
requeues, review relaunches with the corrected brief, and the agent can write
`.orchestra/done`.
The recovery is the lease expiring. It renewed once to `22:56:10Z` (02:56
local), because the agent's 02:12 output counted as real progress against its
launch baseline. The next renewal window opens around 02:46 and must be refused,
since the pane has not moved since.
On expiry the task requeues, review relaunches with the corrected brief, and the
agent can write `.orchestra/done`.
**Do not press anything into that pane.** The relaunch is the proof.
@@ -150,7 +148,7 @@ worker health is a silent stall, and worker health holds one slot (F18).
## Next session, in order
1. Install the worker binary above, then confirm the checksum.
1. Confirm the installed worker checksum matches the revision above.
2. Let run 5's lease expire and watch the review relaunch. Do not intervene.
Expect `.orchestra/done`, an idle confirmation, then finalisation.
3. If it finalises, run 5 is a complete conformance proof. Record it and treat