# Orchestra progress Updated: 2026-07-26 ## Server implementation checklist This is the implementation-oriented breakdown of the specification. It is a project checklist, not a replacement for the binding spec. 1. **Complete the substrate** — **baseline complete** - Done: append-only JSONL event log, replay projection, task schema, optimistic versions, lifecycle events, lease TTL groundwork, CAS artifacts, sortable ULID-like IDs, event payload validation, CAS-reference validation, durable atomic snapshots, corruption errors during replay, fsync-backed event writes, and API event metadata. - Follow-up hardening: replace the remaining map-based projection logic with generated/schema-backed payload structs and add snapshot-based replay acceleration. 2. **Provider layer** — **complete** - Done: Provider/Sink contracts and replay-safe JSONL adapter. - Done: append-only JSONL file watcher/ingester with rotation handling and bounded records. - Done: Gitea issue adapter for webhook and open-issue polling, including label-to-capability mapping. - Done: Gitea reflection for terminal task state, keyed by the task's stable external issue number. - Done: constant-time HMAC webhook authentication and injectable HTTP clients for testing. 3. **Projects and machine registry** — **complete** - Done: typed JSON project, machine, and herdr configuration with duplicate/reference validation. - Done: machine-bound herdr registry with per-herdr capabilities, endpoint override, and concurrency configuration. - Done: injectable reachability checks plus TCP reachability implementation. - Done: hard project machine-affinity resolution; candidates are restricted to configured, reachable herdrs on allowed machines. - Done: optional `ORCHESTRA_CONFIG` startup validation. 4. **Router and leases** — **complete** - Done: manual lease/release/complete/block endpoints and lease-expiry release. - Done: assignment on `TaskCreated` and lease release/expiry. - Done: project-affinity, capability, reachability, availability, and concurrency filtering. - Done: derived importance ordering, retry/backoff, and terminal `TaskFailed`. 5. **Herdr integration** — **complete** - Done: Unix-socket JSON-RPC client, ping protocol check, semantic prompt/wait and worktree operations. - Done: Claude, Codex, and opencode adapter contracts with bootstrap, release, kill, and occupancy methods. - Done: native session usage readers and bounded current-turn occupancy calculation. - Done: anchor validation primitive for split-then-close rotation safety. 6. **Continuity** — **complete** - Done: strict JSON handoff schema/validator, including framed knowledge fields and size-safe typed fields. - Done: CAS-backed handoff save/load with content-address verification. - Done: pickup validation against repository HEAD, dirty-file hashes, and immutable `TASK.md` hash. - Done: scratch-branch WIP commit helper and Markdown change notices. 7. **Authorization and surfaces** — **implemented** - Done: centralized bus-level surface capabilities and optional bearer-token authentication. - Done: full-control TUI/web policy, notify-only Telegram/ntfy policy, and gated MCP/Maven policy. - Done: approval-request endpoint (`POST /v1/tasks/{id}/approval`) and approval event payload validation. - Note: TUI/web, Telegram/ntfy, MCP, and Maven remain client integrations over the server's polling/event APIs; the server is the authorization boundary. 8. **Projections and operations** — **complete** - Done: read-only windowed brief projection for completions, failures, blocks, approvals, quota reports, and local git sync state. - Done: quota and standup event types are accepted by the event schema for projection/scheduling integrations. - Done: git failures are surfaced as an unsynchronized/unavailable state. - Done: operational projection code is covered by tests. - Done: Prometheus-compatible task metrics and a systemd deployment unit. ## Completed - Built the first Go server slice from `orchestra-spec (1).md`. - Added append-only JSONL events and replay projection in `internal/store`. - Added task creation, external-key deduplication, optimistic versions, lifecycle states, and SHA-256 CAS artifacts. - Added HTTP endpoints on default port `9145`: health, task ingest/list, and event cursor reads. - Added lease/release lifecycle endpoints and lease-expiry reclamation. - Finished the item 1 provider port: `provider.Provider`/`Sink` interfaces and a replay-safe JSONL adapter. - Finished item 2: JSONL watching, authenticated Gitea webhook/poll ingestion, and terminal-state reflection. - Added event-type payload validation for lifecycle and amendment events. - Unit tests pass with `go test ./...`. - Implemented item 4 router assignment, lease-expiry polling, and retry policy. - Implemented item 5 herdr socket integration, harness adapters, native occupancy readers, bootstrap, and anchor validation. - Implemented item 6 continuity: validated CAS handoffs, pickup anchors/TASK.md, scratch-branch commits, and shared Markdown change notices. ## Current API additions - `POST /v1/tasks/{id}/lease` with `{"harness_id":"...","ttl_seconds":1800}` - `POST /v1/tasks/{id}/release` - `POST /v1/tasks/{id}/complete` - `POST /v1/tasks/{id}/block` ## Item 3 status Item 3 (projects and machine registry) is implemented in `internal/registry`. Static JSON configuration is loaded and validated, projects resolve only to their explicitly configured machines, and candidate herdrs are filtered by registration and injected reachability. Set `ORCHESTRA_CONFIG` to validate a configuration file at server startup. ## Item 2 status Item 2 (provider layer) is implemented. `internal/provider` now includes `JSONLWatcher`, `Gitea.Poll`, `Gitea.WebhookHandler`, `Gitea.IngestWebhook`, and `Gitea.ReflectTask`. Gitea ingestion remains idempotent through the store's `(source, external_id)` key. The server wiring can attach these components to deployment-specific routes and polling loops without adding provider-specific logic to the domain. ## Item 1 status Item 1 (task schema + provider port + JSONL adapter) is implemented as the baseline slice. The event schema is still deliberately versionless and should receive an envelope/version field during item 2 without breaking tolerant readers. ## Important limitations - This is still a Layer 1 prototype. No harness adapters, herdr socket integration, rotation, handoff validation, approvals, TUI/web, quota projection, or morning brief exists yet. - Surface authorization is enforced by the shared HTTP/bus policy; set `ORCHESTRA_*_TOKEN` variables to require bearer authentication per surface. - Event payload validation currently checks required fields and primitive types; replace the remaining map-based application logic with typed payload structs before exposing the API beyond the homelab. - Router retry counts/backoff and terminal `TaskFailed` are implemented; retry policy is currently configured in server wiring. ## Next agent: recommended order 1. Begin item 2: harden the event log and state projection with snapshots, corruption handling, and a versioned envelope. 2. Add project, machine, and herdr registries from static TOML/JSON config. 3. Implement router selection: project affinity, reachability, capability, availability, and importance ordering. 4. Add retry policy and a background lease-expiry loop. 5. Implement handoff/report schemas and CAS reference validation. 6. Integrate herdr only after the substrate/router tests are stable.