kami d9a5a61965 Hand off with run 5 completed and the plan change designed
Ledger current through F42. Handoff records the two defects found in the
completion tail, the deployed revisions, and the two links the tail still
cannot reach because test-e2e has no gate and no delivery configuration.

PLAN-SPEC-DESIGN.md is the operator-approved design for the ACE-FCA plan gap,
committed as a note. No implementation yet, by instruction.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
2026-08-28 06:58:48 +04:00

7.9 KiB

Handoff: run 5 reached TaskCompleted, plan machinery is designed and frozen

Written 2026-08-28, 06:55 local (02:55 UTC). Read with BURNIN.md (the ledger, now current through F42), PLAN-SPEC-DESIGN.md (the locked design for the next change), HANDOFF-2026-08-28-burnin-4.md (the session before this one), AUDIT.md and CLAUDE.md.

Everything below was observed live unless it says otherwise.

The headline

Run 5 finished. Task 06G4A4F0TFXKZHJE48N05XN1HG, issue kami/test-e2e#5, reached TaskCompleted at 06:48 after two defects were found and fixed in the completion tail.

frame -> research -> plan -> implement -> review -> done -> finalise -> pushed -> completed

Two defects, both live-proven fixed:

  • F41: harness chrome counted as agent progress, so a stalled lease renewed without bound.
  • F42: the result commit refused the completion marker, so completion could never happen.

Deployed state

Half Revision Evidence
Worker, workpc systemd dcd9af4 PID 3634937, started 06:47:50, sha256 25b41562…, journal prints the revision at startup
Coordinator, homesrv container bcaf0cc stale, see below

Branch webui-and-audit-reconciliation, HEAD dcd9af4.

revision  dcd9af4806376caf091e18f669ab52f1ba0dc9df
sha256    25b415629d4a02dca7abe202245ac13f5bdb43b501bc17e371dba75b44f6cebb

Confirm the running worker, not the installed file. Two restarts silently did not happen tonight. sudo install landed the new binary while the old process kept serving from the unlinked inode. /proc/<pid>/exe showed (deleted) and the old hash both times. Check sha256sum /proc/$(systemctl show -p MainPID --value orchestra-worker)/exe, never just the path.

The second missed restart cost run 5 its retry budget: the pre-F42 worker kept failing until the router marked the task failed.

The coordinator is behind, deliberately

2417a39 moved lease TTL to 5 minutes via domain.LeaseTTL, and the coordinator issues the initial lease at internal/router/router.go:318. That half still runs bcaf0cc, so new leases arrive with a 30-minute TTL. Worker renewals send ttl=300 explicitly, which is why run 5 recovered anyway.

Rebuild when convenient, from a detached worktree, never with docker compose build:

git worktree add --detach /tmp/orchestra-build-dcd9af4 dcd9af4
docker build --build-arg BUILD_REVISION=dcd9af4… -f $T/Dockerfile.api -t orchestra-web-ui-orchestra-api $T
docker compose up -d --no-deps orchestra-api

What this session found

F41, harness chrome counted as progress

The 02:46 renewal was granted against a pane idle since 02:12. Reproduced the worker's stored progress_sha byte for byte from the live pane, so the branch taken was progress != l.ProgressSHA, not IsBusy and not an empty baseline.

PaneProgress hashed Claude Code's status footer, whose usage percentage, context counter and version notice all move on their own schedule.

Fixed in 2417a39. Live-proven in both directions on the first window after deployment: renewal at 03:13:48, refusal at 03:16:13, expiry at 03:18:43, relaunch at 03:20:14.

F42, the result commit refused the completion marker

.orchestra/.gitignore contains *, so .orchestra/done is ignored, and git refuses an add whose pathspec names an ignored path. The staging step named the marker. Every completion attempt failed, once every five seconds, for 22 minutes.

Fixed in dcd9af4 by excluding the directory rather than the file. Reproduced both forms in a scratch repo on git 2.55.0 before changing anything.

F18 is now the clear top item

Both defects tonight were five-second retry loops whose only trace was the journal, because each identical error overwrote the single last_error slot. health in the worker state file was {} throughout. The bounded recent-observation ring described in the previous handoff is the fix. This session adds a second concrete instance of the cost.

Where the completion tail stops

Proven: review, done recognised, agent confirmed idle, finalise, result branch pushed, TaskCompleted.

Not proven, and not defects:

  • No quality gate ran. The deployed test-e2e project declares only id, machine_affinity, repo and worktree_root.
  • No PR was opened. The deployed config.jsonc has no sources and no delivery keys. internal/provider/gitea_pr.go implements PR creation, but nothing points this project at a Gitea remote.

Submission, human PR review and merge need registry configuration, not code. That is the cheapest remaining burn-in, and it is a config edit plus one task.

The next change is designed and frozen

PLAN-SPEC-DESIGN.md holds the operator-approved design for the ACE-FCA plan gap. No implementation exists yet, by explicit instruction: the design must not land while the completion tail is still being observed.

Shape, in one paragraph each:

  • plan.md, sealed through the existing path and referenced by the existing t.PlanRef. 128 KiB total bound, structural validation by required headings and phase blocks, no per-line cap. DecodePlan keeps the JSON path for refs already in the CAS.
  • Research ids. Finding{ID, Claim, Evidence, Confidence}, unique ids, confidence limited to fact|inference|assumption. The schema at agentctx.go:167 already promises these and the struct drops them today.
  • Progress that Orchestra establishes. The implementer may write only status: "ready_for_verification". The worker reads that phase's automated verification from the accepted plan, runs it, and records PlanPhaseVerified. An agent cannot write verified.
  • Verification allowlist. Plan commands are argv, executed without a shell, matched against a per-project policy. Absent policy refuses everything.
  • Mismatch as a typed request. PlanMismatchRequest supersedes or reopens research and planning. No new agent-askable backward transition.

The live proof ladder is in the note. Steps 1 and 3 are the rungs that matter for smaller local models. The implement launch contains the plan verbatim, and a rotated successor still receives it whole with phase state intact.

Things that will bite

  • Verify the running worker binary, not the installed one. Twice tonight.
  • The worker state file is a cache, not truth. It read state failed for run 5 while the coordinator still held the task as leasable. I reported the cache as fact. The coordinator disagreed and was right.
  • rm and cp are interactive in this shell. A plain rm prompts, appears to succeed, and leaves the file. Use /bin/rm -f and install.
  • Another session owns 20-plus uncommitted paths, including AUDIT.md, deploy/build.sh, web/ and internal/authn/. Commit by path. Never git add -A.
  • No network from this sandbox. curl to raw.githubusercontent.com times out. WebFetch against a github.com/blob/... URL works.
  • Secrets are guarded. Reading .env or printenv of a token through the shell is blocked. The working recipe is expanding the token inside the container in a single remote command, as HANDOFF-2026-08-28-burnin-4.md records.
  • /tmp is tmpfs with a 10-day sweep. Check /tmp/test-e2e and /tmp/test-e2e-worktrees exist before every run.
  • Two stale monitors may still be armed from this session, tailing the worker journal. They are session-local and die with it.

What I would do next, in order

  1. Rebuild orchestra-api at dcd9af4 so the 5-minute TTL applies at issuance.
  2. Fix F18 as a bounded observation ring, since two more instances landed tonight.
  3. Configure test-e2e with a Gitea remote and a quality gate, then run one task to prove submission, human review and merge.
  4. Implement PLAN-SPEC-DESIGN.md exactly as written, including the allowlist.

Steps 1 through 3 are burn-in and observability. Step 4 is the only new behaviour, and its design no longer needs an architecture pass.