Files
orchestra/AUDIT.md
T
kami 97a9c65302 Delete Design A, the harness-hook completion path, and retired deploy files
Acts on the seven review comments on PR #1.

Design A is gone (comment 4). clients/ deleted rather than tracked: with
workers carrying cross-machine work the bridge is undeployed, which supersedes
the 2026-07-27 "keep through Phase 5" decision. CLAUDE.md, AGENTS.md and
AUDIT.md updated from "retained" to "deleted".

The harness-hook completion path is gone (comment 10). Investigation of the
live OpenCode QA run showed orchestra-worker owns completion end to end: it
watches for .orchestra/done, confirms via AgentStatus that the agent is not
busy, then posts through /v1/federation/* with both lease epoch and expected
version. The hook scripts used a different, older convention
(.orchestra-report.md) and posted to /v1/harness/complete, which had already
been reduced to a 410 stub - so that path could not have completed a task.
Nothing exercised it, because the live run never used it. Deleted: the three
deploy/hooks scripts, the 410 route, the unmounted harnessCompletion handler,
and its test. That test passed against a handler no mux routed to, which is
the exact "looks wired but isn't" pattern CLAUDE.md warns about; the
constant-time token compare added to it earlier today goes with it, having
never been reachable. /v1/harness/turn is untouched and still live.

Retired deployment files (comments 8, 12, 14): deploy/orchestra.service and
deploy/redeploy.sh (which sudo-installed to /usr/local/bin and restarted that
unit), plus deploy/docker-api-entrypoint.sh. The entrypoint was safe to remove
once its premise was checked: env vars reach the container through
`env_file: .env` in compose.yaml, not by sourcing /etc/orchestra/orchestra.env
- only config.jsonc is bind-mounted there - and Dockerfile.api's line 17
already sets ORCHESTRA_DATA/ORCHESTRA_PORT. Dockerfile.api now execs
/app/orchestra directly. orchestra-worker.service is a different, current unit
and is kept.

deploy/config.example.json deleted as a duplicate (comment 6); the annotated
.jsonc is the one registry.go points at, and its header no longer tells the
reader to copy the file that just went away.

Documentation corrected beyond the deletions:
- CLAUDE.md's deployment section claimed the container bind-mounts
  /etc/orchestra:ro and its entrypoint sources the env file. Both wrong.
- AGENTS.md still described a systemd deployment on homesrv as of 2026-07-27.
- AUDIT.md's H5 row still described a "retained compatibility handler".
- deploy/DEPLOYMENT.md still named redeploy.sh as the deployment path.
- deploy/orchestra.env.example still cited EnvironmentFile=.

TOKEN_MINIMAL_WORKFLOW_PLAN.md (comment 2) is untouched: it and WEB_UI_PLAN.md
were both missed by REVIEW.md's documentation sweep, and reconciling a 534-line
forward-looking plan against AUDIT.md is its own task, not a review fixup.

Verified: go build ./..., go vet ./..., go test ./... all pass after the
deletions, and go list ./... has no node_modules entry. No live herdr or pane
was touched; nothing was deployed. The running image still predates this
commit until compose is rebuilt.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
Claude-Session: https://claude.ai/code/session_01GEugbHVYfAXFpTqDYbByEB
2026-07-31 00:29:42 +04:00

12 KiB

Orchestra audit — handoff first

Audited 2026-07-30 against the working tree, spec, deployed coordinator, workpc worker, event log, and live herdr (read-only).

Verdict: the source-level P0/P1/P2 fixes are in place, the live coordinator can replay its repaired event log, and the current OpenCode worker is connected. The system is not safe to run unattended until the controlled QA matrix has passed for all three harnesses.

Evidence

  • go build ./..., go vet ./..., go test ./..., and go test -race ./...: pass.
  • Live B17: release seq=251, re-lease 252, completion 262; the simple probe needed six approvals, logged a 409 lease version conflict, and recorded consumed:0.
  • Live follow-up: Docker owns the coordinator; the old systemd unit is inactive. The pre-v2 repeated-seq=1 event prefix was migrated with a backup-preserving, explicit tool before the current coordinator replayed it.
  • Deployment follow-up: coordinator and installed workpc OpenCode worker are clean revision d6cab133b56666f81f569f4c1c3c9a6f104088d1. The worker service restarted at 2026-07-30 16:07 +04, has emitted no federation failures since, and its configured Unix-socket herdr answered ping with protocol 17.

Federation design status (updated 2026-07-30)

Design B ("workers pull tasks", /v1/federation/*) is the live design. It is no longer clientless: cmd/orchestra-worker/main.go (~1,131 lines, tests in cmd/orchestra-worker/main_test.go) is the deployed worker, and the workpc OpenCode worker runs it. Any earlier statement here or in CLAUDE.md that Design B "has zero clients — no worker binary exists" is obsolete.

The Design A guardrail from the 2026-07-27 decision has landed: Coordinator.adapterFor (internal/orchestrator/orchestrator.go) refuses to resolve an adapter for a session owned by a non-local herdr, so rotation and cleanup can no longer validate a git anchor against the wrong machine's checkout.

Design A is deleted as of 2026-07-31, superseding the 2026-07-27 "retain through Phase 5" decision: the operator confirmed the bridge is undeployed now that workers carry cross-machine work, so clients/ was removed rather than tracked. The Phase 6 cutover is therefore already done on this axis.

The legacy harness-hook completion path was removed in the same pass, once it was confirmed that nothing calls it. orchestra-worker owns completion — it watches for .orchestra/done, confirms via AgentStatus that the agent is not busy, then posts through /v1/federation/* with the lease epoch and expected version. Deleted: the /v1/harness/complete route (a 410 stub), its unmounted harnessCompletion handler, that handler's test (green against unreachable code — the pattern this audit exists to catch), and the three deploy/hooks/ scripts, which still used the older .orchestra-report.md marker and would have failed against the 410. /v1/harness/turn is unaffected and still live.

Note for the QA matrix: the OpenCode run completed through the worker path, so no hook script was exercised. Nothing about hook-based completion was ever verified live, which is why deleting it costs nothing.

Remaining release blockers

  • Only OpenCode capacity is ready. Workpc's workpc-opencode worker has a configured project file and a reachable local herdr Unix socket. Homesrv has no reachable herdr, and no Claude/Codex worker/herdr pair has been verified, so the full three-harness matrix cannot begin yet.
  • B17 needs a fresh controlled run. The historical probe's six approvals, one 409 lease version conflict, and consumed:0 receipt came from the old worker. They cannot be treated as evidence for the current worker until a live OpenCode run is repeated; Claude and Codex require their own runs.

QA handoff — next agent

  1. Preflight before creating work. Read GET /v1/federation/workers and coordinator diagnostics through an authenticated operator session. Confirm each target worker reports revision d6cab13, supported test-e2e, and fresh herdr_status: reachable; raw-ping its configured local Unix socket with params:{} and confirm protocol 17. Confirm no pre-existing agents or leased task on the target harness.
  2. OpenCode controlled continuity run. Submit one new disposable test-e2e task that makes a deterministic marker, releases at a clear turn boundary, validates pickup from the resulting anchor, then completes. Record event sequence, handoff ref, anchor SHA, transaction id, lease epoch, native session evidence, quality-gate result, remote SHA, and a receipt with known non-zero (or explicitly explained known-zero) usage. Do not use destructive herdr calls against unrelated panes.
  3. Exercise rotation and recovery. In separate disposable tasks, trigger soft, hard, milestone, thrash, coordinator restart, worker restart/lost response, stale completion, and corrupted-worker-state paths. Verify each result is a fenced lifecycle event or durable needs_attention, never a silent retry or orphaned pane. Preserve the predecessor until matching pickup validation.
  4. Repeat on Claude and Codex only after provisioning their own reachable worker/herdr pairs. Do not treat OpenCode evidence as cross-harness proof. After all runs, compare worker/coordinator revisions and checksums, attach the artifacts/event ranges to this audit, and only then clear the live release gate.

P0 — correctness

ID Current failure Required fix
H1 Closed 2026-07-30. The checkout-owning worker and coordinator turn path now use RotationStateMachine. Workers persist harness-native identity (Claude/Codex transcript, OpenCode SQLite session id), apply soft/milestone/thrash/hard-boundary decisions, and record unknown activity/occupancy/boundary as degraded health rather than zero usage. Verified by go test -race ./...; the existing turn-policy coverage now exercises the shared state machine.
H2 Closed 2026-07-30. PrepareRelease verifies immutable TASK.md, checkpoints all repository work except protocol markers, always pushes the per-task project's scratch anchor, verifies it with ls-remote, and only then seals the CAS handoff. TestScratchCommitCapturesAllGitStatesExceptProtocolMarkers covers staged, deleted, renamed, untracked, and protocol-marker cases; release uses the configured project remote.
H3 Closed 2026-07-30. Worker state persists idempotent release transactions through prepared → anchor_pushed → event_committed → pickup_validated → predecessor_retired. Release/pickup endpoints bind transaction, anchor, and lease version; a predecessor remains mapped and is retired only after matching pickup validation. TestReleaseTransactionSurvivesReLeaseUntilMatchingPickup covers transaction propagation and pickup epoch binding; full race suite passes.
H4 Closed 2026-07-30. Every new lease carries an opaque durable lease_epoch; renew/release/pickup/complete validate the exact harness owner and epoch at the store boundary and federation API. Offline heartbeats retain leases until expiry, new workers require a fresh reachable local-herdr probe, and local/worker ownership loss stops or durably quarantines the old pane before its mapping is dropped. TestLeaseEpochFencesStaleOwnerLifecycleWrites, TestAvailableRequiresFreshReachableLocalHerdrHealth, plus the full race suite cover stale re-lease/completion and health admission.
H5 Closed 2026-07-30. Store.Append validates legal state/owner/epoch transitions, fsyncs the event before applying its projection, and replays projections solely from events.jsonl (snapshots are disposable caches). CAS, worker/federation/coordinator state use temp-file + fsync + rename; corrupt worker state aborts startup. The legacy /v1/harness/complete route and its handler were deleted outright on 2026-07-31 (previously a 410 stub plus an unmounted, separately-fenced handler). TestOpenRebuildsOnlyFromLogAndIgnoresCorruptSnapshot, TestWorkerRefusesCorruptDurableState, and go test -race ./... pass.

P1 — autonomy and recovery

  • Recovery: Closed 2026-07-30. Launch/recovery faults now emit TaskNeedsAttention, retaining the durable harness owner and lease epoch. Renew, release, expiry, and a late reconciled completion accept that same fenced lease; worker state advances its expected aggregate version without dropping the live session. TaskBlocked remains terminal for an explicit operator block. TestNeedsAttentionRetainsFencedLeaseForLateCompletion covers the durable recovery path.
  • Retries: Closed 2026-07-30. Hand-off-less TaskReleased is the single durable reclaim transition. It projects exponential attempt, next_retry_at, and failure_class; router assignment reads those fields, so coordinator restarts cannot reset a backoff or retry limit. TestReclaimPersistsAttemptAndBackoffAcrossReopen covers replay.
  • Launch: Closed 2026-07-30. Workers emit a fenced TaskLaunchAcknowledged only after a local start/prompt is persisted. Typed NACKs immediately reclaim transient unusable capacity, terminally block invalid handoffs, and retain uncertain live panes for reconciliation.
  • Completion: Closed 2026-07-30. .orchestra/done is explicit intent only; the worker also requires native non-busy identity, runs its quality gate, verifies immutable TASK.md, commits, pushes, and checks the remote SHA before it emits completion.
  • Quota: Closed 2026-07-30. Completion receipts contain native per-lease deltas plus a known/unknown marker. Five-hour and weekly projections are published from the same receipts; any bounded harness without fresh known usage fails routing closed.
  • Approvals: Closed 2026-07-30. Projects have a validated audited safe_operations policy limited to worktree-local read/edit/test/Git. Workers inject it into the task prompt; network, secrets, destructive actions, and paths outside the worktree remain operator-gated.
  • Observability: Closed 2026-07-30. Task projections now retain lifecycle phase, last error, retry time/failure class, lease epoch, pane state, and anchor. Release/anchor certification faults enter durable needs_attention instead of disappearing through retry continue paths.

P2 — performance

  • Closed 2026-07-30. Each scheduling pass takes one atomic task/lease snapshot, batches cached (TTL) reachability probes concurrently, and evaluates candidate availability once. It no longer probes candidates or scans active tasks once per queued task.
  • Closed 2026-07-30. Active leases and per-harness, time-ordered quota receipts are projection indexes. Availability uses indexed rolling-window sums rather than decoding the event log; the task snapshot is a one-time disposable compatibility cache rather than a full rewrite on every append.
  • Closed 2026-07-30. BenchmarkAssignPending{1K,10K} and BenchmarkAppend{1K,10K} report and enforce p95 budgets, with durable fsync cost included in their respective paths.

Delivery order

  1. Durable event transitions + lease fencing.
  2. Idempotent checkpoint/release/pickup transaction.
  3. Worker-local rotation, completion, quota, and typed recovery.
  4. Approval policy and performance indexes.
  5. Only then: ingestion/UI expansion.

Release gate

  • Pass: build, vet, test, and race checks pass; unit/integration coverage includes the defined fault and cross-machine cases.
  • Pending QA: run the controlled soft, hard, milestone, thrash, completion, and late-recovery paths on OpenCode, Claude, and Codex without manual intervention for safe repository work. Follow the QA handoff above and attach the resulting event ranges/artifacts before clearing this gate.