8.1 KiB
8.1 KiB
Orchestra audit — handoff first
Audited 2026-07-30 against the working tree, spec, deployed coordinator, workpc worker, event log, and live herdr (read-only).
Verdict: the source-level P0/P1/P2 fixes are in place and the live coordinator can replay its repaired event log, but the system is not safe to run unattended until live harness capacity and the worker rollout are restored.
Evidence
go build ./...,go vet ./...,go test ./..., andgo test -race ./...: pass.- Live B17: release
seq=251, re-lease252, completion262; the simple probe needed six approvals, logged a409 lease version conflict, and recordedconsumed:0. - Live follow-up: Docker owns the coordinator; the old systemd unit is
inactive. The pre-v2 repeated-
seq=1event prefix was migrated with a backup-preserving, explicit tool before the current coordinator replayed it.
Remaining release blockers
- No live harness capacity. Homesrv has no reachable herdr. Workpc has no listener on any expected herdr port, so no safe live rotation, handoff, completion, or late-recovery path can be exercised on Claude, Codex, or OpenCode.
- Worker rollout needs an administrator. Workpc is still running the old
dirty
1ca9d64/usr/local/bin/orchestra-worker. The current worker binary is staged at~/orchestra-deploy/orchestra-worker, but this account cannot install it or restart the systemd service. Its project configuration must also declare supported projects before routing can admit a task. - B17 needs a fresh controlled run. The historical probe's six approvals,
one
409 lease version conflict, andconsumed:0receipt came from the old worker. They cannot be treated as evidence for the current worker until a live OpenCode run is repeated; Claude and Codex require their own runs.
P0 — correctness
| ID | Current failure | Required fix |
|---|---|---|
| H1 | Closed 2026-07-30. The checkout-owning worker and coordinator turn path now use RotationStateMachine. Workers persist harness-native identity (Claude/Codex transcript, OpenCode SQLite session id), apply soft/milestone/thrash/hard-boundary decisions, and record unknown activity/occupancy/boundary as degraded health rather than zero usage. |
Verified by go test -race ./...; the existing turn-policy coverage now exercises the shared state machine. |
| H2 | Closed 2026-07-30. PrepareRelease verifies immutable TASK.md, checkpoints all repository work except protocol markers, always pushes the per-task project's scratch anchor, verifies it with ls-remote, and only then seals the CAS handoff. |
TestScratchCommitCapturesAllGitStatesExceptProtocolMarkers covers staged, deleted, renamed, untracked, and protocol-marker cases; release uses the configured project remote. |
| H3 | Closed 2026-07-30. Worker state persists idempotent release transactions through prepared → anchor_pushed → event_committed → pickup_validated → predecessor_retired. Release/pickup endpoints bind transaction, anchor, and lease version; a predecessor remains mapped and is retired only after matching pickup validation. |
TestReleaseTransactionSurvivesReLeaseUntilMatchingPickup covers transaction propagation and pickup epoch binding; full race suite passes. |
| H4 | Closed 2026-07-30. Every new lease carries an opaque durable lease_epoch; renew/release/pickup/complete validate the exact harness owner and epoch at the store boundary and federation API. Offline heartbeats retain leases until expiry, new workers require a fresh reachable local-herdr probe, and local/worker ownership loss stops or durably quarantines the old pane before its mapping is dropped. |
TestLeaseEpochFencesStaleOwnerLifecycleWrites, TestAvailableRequiresFreshReachableLocalHerdrHealth, plus the full race suite cover stale re-lease/completion and health admission. |
| H5 | Closed 2026-07-30. Store.Append validates legal state/owner/epoch transitions, fsyncs the event before applying its projection, and replays projections solely from events.jsonl (snapshots are disposable caches). CAS, worker/federation/coordinator state use temp-file + fsync + rename; corrupt worker state aborts startup. The live legacy /v1/harness/complete route is retired (410); its retained compatibility handler is fenced if invoked directly. |
TestOpenRebuildsOnlyFromLogAndIgnoresCorruptSnapshot, TestWorkerRefusesCorruptDurableState, and go test -race ./... pass. |
P1 — autonomy and recovery
- Recovery: Closed 2026-07-30. Launch/recovery faults now emit
TaskNeedsAttention, retaining the durable harness owner and lease epoch. Renew, release, expiry, and a late reconciled completion accept that same fenced lease; worker state advances its expected aggregate version without dropping the live session.TaskBlockedremains terminal for an explicit operator block.TestNeedsAttentionRetainsFencedLeaseForLateCompletioncovers the durable recovery path. - Retries: Closed 2026-07-30. Hand-off-less
TaskReleasedis the single durable reclaim transition. It projects exponentialattempt,next_retry_at, andfailure_class; router assignment reads those fields, so coordinator restarts cannot reset a backoff or retry limit.TestReclaimPersistsAttemptAndBackoffAcrossReopencovers replay. - Launch: Closed 2026-07-30. Workers emit a fenced
TaskLaunchAcknowledgedonly after a local start/prompt is persisted. Typed NACKs immediately reclaim transient unusable capacity, terminally block invalid handoffs, and retain uncertain live panes for reconciliation. - Completion: Closed 2026-07-30.
.orchestra/doneis explicit intent only; the worker also requires native non-busy identity, runs its quality gate, verifies immutableTASK.md, commits, pushes, and checks the remote SHA before it emits completion. - Quota: Closed 2026-07-30. Completion receipts contain native per-lease deltas plus a known/unknown marker. Five-hour and weekly projections are published from the same receipts; any bounded harness without fresh known usage fails routing closed.
- Approvals: Closed 2026-07-30. Projects have a validated audited
safe_operationspolicy limited to worktree-local read/edit/test/Git. Workers inject it into the task prompt; network, secrets, destructive actions, and paths outside the worktree remain operator-gated. - Observability: Closed 2026-07-30. Task projections now retain
lifecycle phase, last error, retry time/failure class, lease epoch, pane
state, and anchor. Release/anchor certification faults enter durable
needs_attentioninstead of disappearing through retrycontinuepaths.
P2 — performance
- Closed 2026-07-30. Each scheduling pass takes one atomic task/lease snapshot, batches cached (TTL) reachability probes concurrently, and evaluates candidate availability once. It no longer probes candidates or scans active tasks once per queued task.
- Closed 2026-07-30. Active leases and per-harness, time-ordered quota receipts are projection indexes. Availability uses indexed rolling-window sums rather than decoding the event log; the task snapshot is a one-time disposable compatibility cache rather than a full rewrite on every append.
- Closed 2026-07-30.
BenchmarkAssignPending{1K,10K}andBenchmarkAppend{1K,10K}report and enforce p95 budgets, with durable fsync cost included in their respective paths.
Delivery order
- Durable event transitions + lease fencing.
- Idempotent checkpoint/release/pickup transaction.
- Worker-local rotation, completion, quota, and typed recovery.
- Approval policy and performance indexes.
- Only then: ingestion/UI expansion.
Release gate
- Pass: build, vet, test, and race checks pass; unit/integration coverage includes the defined fault and cross-machine cases.
- Pending live capacity: run the controlled soft, hard, milestone, thrash, completion, and late-recovery paths on each harness without manual intervention for safe repository work.
- Pending worker installation: install the staged worker, restart it after herdr is restored, and verify its checksum and immutable build revision against the coordinator diagnostics.