6.9 KiB
6.9 KiB
Orchestra audit — handoff first
Audited 2026-07-30 against the working tree, spec, deployed coordinator, workpc worker, event log, and live herdr (read-only).
Verdict: one worker handoff completed, but the system is not safe to run unattended. It can skip rotation, omit Git state, split ownership, strand a released agent, or reject a valid completion.
Evidence
go build ./...,go vet ./...,go test ./..., andgo test -race ./...: pass.- Live B17: release
seq=251, re-lease252, completion262; the simple probe needed six approvals, logged a409 lease version conflict, and recordedconsumed:0. - Live now: Docker owns the coordinator; the old systemd unit is inactive.
Workpc runs a dirty
1ca9d64worker build. No task is active and live herdr reports no agents. This does not prove the current working tree.
P0 — correctness
| ID | Current failure | Required fix |
|---|---|---|
| H1 | Closed 2026-07-30. The checkout-owning worker and coordinator turn path now use RotationStateMachine. Workers persist harness-native identity (Claude/Codex transcript, OpenCode SQLite session id), apply soft/milestone/thrash/hard-boundary decisions, and record unknown activity/occupancy/boundary as degraded health rather than zero usage. |
Verified by go test -race ./...; the existing turn-policy coverage now exercises the shared state machine. |
| H2 | Closed 2026-07-30. PrepareRelease verifies immutable TASK.md, checkpoints all repository work except protocol markers, always pushes the per-task project's scratch anchor, verifies it with ls-remote, and only then seals the CAS handoff. |
TestScratchCommitCapturesAllGitStatesExceptProtocolMarkers covers staged, deleted, renamed, untracked, and protocol-marker cases; release uses the configured project remote. |
| H3 | Closed 2026-07-30. Worker state persists idempotent release transactions through prepared → anchor_pushed → event_committed → pickup_validated → predecessor_retired. Release/pickup endpoints bind transaction, anchor, and lease version; a predecessor remains mapped and is retired only after matching pickup validation. |
TestReleaseTransactionSurvivesReLeaseUntilMatchingPickup covers transaction propagation and pickup epoch binding; full race suite passes. |
| H4 | Closed 2026-07-30. Every new lease carries an opaque durable lease_epoch; renew/release/pickup/complete validate the exact harness owner and epoch at the store boundary and federation API. Offline heartbeats retain leases until expiry, new workers require a fresh reachable local-herdr probe, and local/worker ownership loss stops or durably quarantines the old pane before its mapping is dropped. |
TestLeaseEpochFencesStaleOwnerLifecycleWrites, TestAvailableRequiresFreshReachableLocalHerdrHealth, plus the full race suite cover stale re-lease/completion and health admission. |
| H5 | Closed 2026-07-30. Store.Append validates legal state/owner/epoch transitions, fsyncs the event before applying its projection, and replays projections solely from events.jsonl (snapshots are disposable caches). CAS, worker/federation/coordinator state use temp-file + fsync + rename; corrupt worker state aborts startup. The live legacy /v1/harness/complete route is retired (410); its retained compatibility handler is fenced if invoked directly. |
TestOpenRebuildsOnlyFromLogAndIgnoresCorruptSnapshot, TestWorkerRefusesCorruptDurableState, and go test -race ./... pass. |
P1 — autonomy and recovery
- Recovery: Closed 2026-07-30. Launch/recovery faults now emit
TaskNeedsAttention, retaining the durable harness owner and lease epoch. Renew, release, expiry, and a late reconciled completion accept that same fenced lease; worker state advances its expected aggregate version without dropping the live session.TaskBlockedremains terminal for an explicit operator block.TestNeedsAttentionRetainsFencedLeaseForLateCompletioncovers the durable recovery path. - Retries: Closed 2026-07-30. Hand-off-less
TaskReleasedis the single durable reclaim transition. It projects exponentialattempt,next_retry_at, andfailure_class; router assignment reads those fields, so coordinator restarts cannot reset a backoff or retry limit.TestReclaimPersistsAttemptAndBackoffAcrossReopencovers replay. - Launch: Closed 2026-07-30. Workers emit a fenced
TaskLaunchAcknowledgedonly after a local start/prompt is persisted. Typed NACKs immediately reclaim transient unusable capacity, terminally block invalid handoffs, and retain uncertain live panes for reconciliation. - Completion: Closed 2026-07-30.
.orchestra/doneis explicit intent only; the worker also requires native non-busy identity, runs its quality gate, verifies immutableTASK.md, commits, pushes, and checks the remote SHA before it emits completion. - Quota: Closed 2026-07-30. Completion receipts contain native per-lease deltas plus a known/unknown marker. Five-hour and weekly projections are published from the same receipts; any bounded harness without fresh known usage fails routing closed.
- Approvals: Closed 2026-07-30. Projects have a validated audited
safe_operationspolicy limited to worktree-local read/edit/test/Git. Workers inject it into the task prompt; network, secrets, destructive actions, and paths outside the worktree remain operator-gated. - Observability: Closed 2026-07-30. Task projections now retain
lifecycle phase, last error, retry time/failure class, lease epoch, pane
state, and anchor. Release/anchor certification faults enter durable
needs_attentioninstead of disappearing through retrycontinuepaths.
P2 — performance
- Cache/parallelise health probes; schedule from one task/worker snapshot. Current routing repeatedly scans tasks and probes candidates per queued task.
- Index active leases and quota windows. Do not scan the whole event log per availability check or rewrite the full task snapshot after every event.
- Add 1k/10k-task benchmarks with assignment and append p95 budgets.
Delivery order
- Durable event transitions + lease fencing.
- Idempotent checkpoint/release/pickup transaction.
- Worker-local rotation, completion, quota, and typed recovery.
- Approval policy and performance indexes.
- Only then: ingestion/UI expansion.
Release gate
- All build/vet/test/race checks pass.
- Fault-inject every handoff phase, coordinator/worker restart, lost response, worker partition/rejoin, stale completion, and corrupt state file.
- Cross-machine tests cover staged/deleted/clean-committed work and prove the predecessor remains recoverable until successor pickup validation.
- Live controlled runs pass soft, hard, milestone, thrash, completion, and late-recovery paths on each harness without manual intervention for safe repository work.
- Coordinator and workers report the same immutable build revision; staged worker checksum and Go build revision match before restart.