Files
correx/docs/epics/epic-5-resolution.md

1.0 KiB

Epic 5 — Approval system (Tiers, grants, approvals)

completed deliverables

1. Tier model (T0-T4)

introduced Tier as a enum in core:events with values 0-4 where 0 is inference and 4 is something destructive.


2. grants system

introduced ApprovalGrant as a serializable data class in core:approvals.

scopes:

Session -> stage -> project

properties:

  • all grants work on the concrete scope.
  • grants are revoked when scope changes.
  • grants contain set of permittedTiers.

3. approval lifecycle events

introduced events in :core:events to emit when approval is:

  • ApprovalRequested
  • ApprovalDecisionResolved
  • ApprovalGrantCreated
  • ApprovalGrantExpired

4. timeout semantics

timeout are resolved on a higher level, not in approval system.


5. steering injection module

introduced UserSteering in core:events. gets injected in approval and should be respected by other components.


final state

Correx now has:

tiered, replay-safe approval authorization layer