99 lines
7.3 KiB
Markdown
99 lines
7.3 KiB
Markdown
# Orchestra audit — handoff first
|
|
|
|
Audited 2026-07-30 against the working tree, spec, deployed coordinator,
|
|
workpc worker, event log, and live herdr (read-only).
|
|
|
|
**Verdict:** one worker handoff completed, but the system is not safe to run
|
|
unattended. It can skip rotation, omit Git state, split ownership, strand a
|
|
released agent, or reject a valid completion.
|
|
|
|
## Evidence
|
|
|
|
- `go build ./...`, `go vet ./...`, `go test ./...`, and `go test -race ./...`: pass.
|
|
- Live B17: release `seq=251`, re-lease `252`, completion `262`; the simple
|
|
probe needed six approvals, logged a `409 lease version conflict`, and
|
|
recorded `consumed:0`.
|
|
- Live now: Docker owns the coordinator; the old systemd unit is inactive.
|
|
Workpc runs a dirty `1ca9d64` worker build. No task is active and live herdr
|
|
reports no agents. This does not prove the current working tree.
|
|
|
|
## P0 — correctness
|
|
|
|
| ID | Current failure | Required fix |
|
|
|---|---|---|
|
|
| H1 | **Closed 2026-07-30.** The checkout-owning worker and coordinator turn path now use `RotationStateMachine`. Workers persist harness-native identity (Claude/Codex transcript, OpenCode SQLite session id), apply soft/milestone/thrash/hard-boundary decisions, and record unknown activity/occupancy/boundary as degraded health rather than zero usage. | Verified by `go test -race ./...`; the existing turn-policy coverage now exercises the shared state machine. |
|
|
| H2 | **Closed 2026-07-30.** `PrepareRelease` verifies immutable `TASK.md`, checkpoints all repository work except protocol markers, always pushes the per-task project's scratch anchor, verifies it with `ls-remote`, and only then seals the CAS handoff. | `TestScratchCommitCapturesAllGitStatesExceptProtocolMarkers` covers staged, deleted, renamed, untracked, and protocol-marker cases; release uses the configured project remote. |
|
|
| H3 | **Closed 2026-07-30.** Worker state persists idempotent release transactions through `prepared → anchor_pushed → event_committed → pickup_validated → predecessor_retired`. Release/pickup endpoints bind transaction, anchor, and lease version; a predecessor remains mapped and is retired only after matching pickup validation. | `TestReleaseTransactionSurvivesReLeaseUntilMatchingPickup` covers transaction propagation and pickup epoch binding; full race suite passes. |
|
|
| H4 | **Closed 2026-07-30.** Every new lease carries an opaque durable `lease_epoch`; renew/release/pickup/complete validate the exact harness owner and epoch at the store boundary and federation API. Offline heartbeats retain leases until expiry, new workers require a fresh reachable local-herdr probe, and local/worker ownership loss stops or durably quarantines the old pane before its mapping is dropped. | `TestLeaseEpochFencesStaleOwnerLifecycleWrites`, `TestAvailableRequiresFreshReachableLocalHerdrHealth`, plus the full race suite cover stale re-lease/completion and health admission. |
|
|
| H5 | **Closed 2026-07-30.** `Store.Append` validates legal state/owner/epoch transitions, fsyncs the event before applying its projection, and replays projections solely from `events.jsonl` (snapshots are disposable caches). CAS, worker/federation/coordinator state use temp-file + fsync + rename; corrupt worker state aborts startup. The live legacy `/v1/harness/complete` route is retired (410); its retained compatibility handler is fenced if invoked directly. | `TestOpenRebuildsOnlyFromLogAndIgnoresCorruptSnapshot`, `TestWorkerRefusesCorruptDurableState`, and `go test -race ./...` pass. |
|
|
|
|
## P1 — autonomy and recovery
|
|
|
|
- **Recovery:** **Closed 2026-07-30.** Launch/recovery faults now emit
|
|
`TaskNeedsAttention`, retaining the durable harness owner and lease epoch.
|
|
Renew, release, expiry, and a late reconciled completion accept that same
|
|
fenced lease; worker state advances its expected aggregate version without
|
|
dropping the live session. `TaskBlocked` remains terminal for an explicit
|
|
operator block. `TestNeedsAttentionRetainsFencedLeaseForLateCompletion`
|
|
covers the durable recovery path.
|
|
- **Retries:** **Closed 2026-07-30.** Hand-off-less `TaskReleased` is the
|
|
single durable reclaim transition. It projects exponential `attempt`,
|
|
`next_retry_at`, and `failure_class`; router assignment reads those fields,
|
|
so coordinator restarts cannot reset a backoff or retry limit.
|
|
`TestReclaimPersistsAttemptAndBackoffAcrossReopen` covers replay.
|
|
- **Launch:** **Closed 2026-07-30.** Workers emit a fenced
|
|
`TaskLaunchAcknowledged` only after a local start/prompt is persisted.
|
|
Typed NACKs immediately reclaim transient unusable capacity, terminally
|
|
block invalid handoffs, and retain uncertain live panes for reconciliation.
|
|
- **Completion:** **Closed 2026-07-30.** `.orchestra/done` is explicit
|
|
intent only; the worker also requires native non-busy identity, runs its
|
|
quality gate, verifies immutable `TASK.md`, commits, pushes, and checks
|
|
the remote SHA before it emits completion.
|
|
- **Quota:** **Closed 2026-07-30.** Completion receipts contain native
|
|
per-lease deltas plus a known/unknown marker. Five-hour and weekly
|
|
projections are published from the same receipts; any bounded harness
|
|
without fresh known usage fails routing closed.
|
|
- **Approvals:** **Closed 2026-07-30.** Projects have a validated audited
|
|
`safe_operations` policy limited to worktree-local read/edit/test/Git.
|
|
Workers inject it into the task prompt; network, secrets, destructive
|
|
actions, and paths outside the worktree remain operator-gated.
|
|
- **Observability:** **Closed 2026-07-30.** Task projections now retain
|
|
lifecycle phase, last error, retry time/failure class, lease epoch, pane
|
|
state, and anchor. Release/anchor certification faults enter durable
|
|
`needs_attention` instead of disappearing through retry `continue` paths.
|
|
|
|
## P2 — performance
|
|
|
|
- **Closed 2026-07-30.** Each scheduling pass takes one atomic task/lease
|
|
snapshot, batches cached (TTL) reachability probes concurrently, and
|
|
evaluates candidate availability once. It no longer probes candidates or
|
|
scans active tasks once per queued task.
|
|
- **Closed 2026-07-30.** Active leases and per-harness, time-ordered quota
|
|
receipts are projection indexes. Availability uses indexed rolling-window
|
|
sums rather than decoding the event log; the task snapshot is a one-time
|
|
disposable compatibility cache rather than a full rewrite on every append.
|
|
- **Closed 2026-07-30.** `BenchmarkAssignPending{1K,10K}` and
|
|
`BenchmarkAppend{1K,10K}` report and enforce p95 budgets, with durable
|
|
fsync cost included in their respective paths.
|
|
|
|
## Delivery order
|
|
|
|
1. Durable event transitions + lease fencing.
|
|
2. Idempotent checkpoint/release/pickup transaction.
|
|
3. Worker-local rotation, completion, quota, and typed recovery.
|
|
4. Approval policy and performance indexes.
|
|
5. Only then: ingestion/UI expansion.
|
|
|
|
## Release gate
|
|
|
|
- All build/vet/test/race checks pass.
|
|
- Fault-inject every handoff phase, coordinator/worker restart, lost response,
|
|
worker partition/rejoin, stale completion, and corrupt state file.
|
|
- Cross-machine tests cover staged/deleted/clean-committed work and prove the
|
|
predecessor remains recoverable until successor pickup validation.
|
|
- Live controlled runs pass soft, hard, milestone, thrash, completion, and
|
|
late-recovery paths on each harness without manual intervention for safe
|
|
repository work.
|
|
- Coordinator and workers report the same immutable build revision; staged
|
|
worker checksum and Go build revision match before restart.
|