Files
orchestra/progress.md
T
2026-07-26 19:07:03 +04:00

111 lines
6.7 KiB
Markdown

# Orchestra progress
Updated: 2026-07-26
## Server implementation checklist
This is the implementation-oriented breakdown of the specification. It is a project checklist, not a replacement for the binding spec.
1. **Complete the substrate****baseline complete**
- Done: append-only JSONL event log, replay projection, task schema, optimistic versions, lifecycle events, lease TTL groundwork, CAS artifacts, sortable ULID-like IDs, event payload validation, CAS-reference validation, durable atomic snapshots, corruption errors during replay, fsync-backed event writes, and API event metadata.
- Follow-up hardening: replace the remaining map-based projection logic with generated/schema-backed payload structs and add snapshot-based replay acceleration.
2. **Provider layer****complete**
- Done: Provider/Sink contracts and replay-safe JSONL adapter.
- Done: append-only JSONL file watcher/ingester with rotation handling and bounded records.
- Done: Gitea issue adapter for webhook and open-issue polling, including label-to-capability mapping.
- Done: Gitea reflection for terminal task state, keyed by the task's stable external issue number.
- Done: constant-time HMAC webhook authentication and injectable HTTP clients for testing.
3. **Projects and machine registry****complete**
- Done: typed JSON project, machine, and herdr configuration with duplicate/reference validation.
- Done: machine-bound herdr registry with per-herdr capabilities, endpoint override, and concurrency configuration.
- Done: injectable reachability checks plus TCP reachability implementation.
- Done: hard project machine-affinity resolution; candidates are restricted to configured, reachable herdrs on allowed machines.
- Done: optional `ORCHESTRA_CONFIG` startup validation.
4. **Router and leases****complete**
- Done: manual lease/release/complete/block endpoints and lease-expiry release.
- Done: assignment on `TaskCreated` and lease release/expiry.
- Done: project-affinity, capability, reachability, availability, and concurrency filtering.
- Done: derived importance ordering, retry/backoff, and terminal `TaskFailed`.
5. **Herdr integration****complete**
- Done: Unix-socket JSON-RPC client, ping protocol check, semantic prompt/wait and worktree operations.
- Done: Claude, Codex, and opencode adapter contracts with bootstrap, release, kill, and occupancy methods.
- Done: native session usage readers and bounded current-turn occupancy calculation.
- Done: anchor validation primitive for split-then-close rotation safety.
6. **Continuity****not started**
- Handoff schema and validator
- CAS-backed handoffs/reports
- Immutable `TASK.md` handling
- Scratch-branch pickup contract
- Shared Markdown change notifications
7. **Authorization and surfaces****minimal groundwork only**
- Done: a basic notify-only guard for Telegram/ntfy-style requests.
- Remaining:
- Real bus-level authorization
- TUI/web control surface
- Telegram/ntfy read-only subscribers
- Approval request/grant/deny flow
- MCP gated writes
- Maven gated control
8. **Projections and operations****not started**
- Quota projection
- Nightly/morning brief
- Git sync state
- Standup advisory events
- Logging, metrics, service packaging, and deployment configuration
## Completed
- Built the first Go server slice from `orchestra-spec (1).md`.
- Added append-only JSONL events and replay projection in `internal/store`.
- Added task creation, external-key deduplication, optimistic versions, lifecycle states, and SHA-256 CAS artifacts.
- Added HTTP endpoints on default port `9145`: health, task ingest/list, and event cursor reads.
- Added lease/release lifecycle endpoints and lease-expiry reclamation.
- Finished the item 1 provider port: `provider.Provider`/`Sink` interfaces and a replay-safe JSONL adapter.
- Finished item 2: JSONL watching, authenticated Gitea webhook/poll ingestion, and terminal-state reflection.
- Added event-type payload validation for lifecycle and amendment events.
- Unit tests pass with `go test ./...`.
- Implemented item 4 router assignment, lease-expiry polling, and retry policy.
- Implemented item 5 herdr socket integration, harness adapters, native occupancy readers, bootstrap, and anchor validation.
## Current API additions
- `POST /v1/tasks/{id}/lease` with `{"harness_id":"...","ttl_seconds":1800}`
- `POST /v1/tasks/{id}/release`
- `POST /v1/tasks/{id}/complete`
- `POST /v1/tasks/{id}/block`
## Item 3 status
Item 3 (projects and machine registry) is implemented in `internal/registry`. Static JSON configuration is loaded and validated, projects resolve only to their explicitly configured machines, and candidate herdrs are filtered by registration and injected reachability. Set `ORCHESTRA_CONFIG` to validate a configuration file at server startup.
## Item 2 status
Item 2 (provider layer) is implemented. `internal/provider` now includes `JSONLWatcher`, `Gitea.Poll`, `Gitea.WebhookHandler`, `Gitea.IngestWebhook`, and `Gitea.ReflectTask`. Gitea ingestion remains idempotent through the store's `(source, external_id)` key. The server wiring can attach these components to deployment-specific routes and polling loops without adding provider-specific logic to the domain.
## Item 1 status
Item 1 (task schema + provider port + JSONL adapter) is implemented as the baseline slice. The event schema is still deliberately versionless and should receive an envelope/version field during item 2 without breaking tolerant readers.
## Important limitations
- This is still a Layer 1 prototype. No harness adapters, herdr socket integration, rotation, handoff validation, approvals, TUI/web, quota projection, or morning brief exists yet.
- HTTP authorization is only the initial notify-only guard; there is no real bus authorization or authentication.
- Event payload validation currently checks required fields and primitive types; replace the remaining map-based application logic with typed payload structs before exposing the API beyond the homelab.
- Router retry counts/backoff and terminal `TaskFailed` are implemented; retry policy is currently configured in server wiring.
## Next agent: recommended order
1. Begin item 2: harden the event log and state projection with snapshots, corruption handling, and a versioned envelope.
2. Add project, machine, and herdr registries from static TOML/JSON config.
3. Implement router selection: project affinity, reachability, capability, availability, and importance ordering.
4. Add retry policy and a background lease-expiry loop.
5. Implement handoff/report schemas and CAS reference validation.
6. Integrate herdr only after the substrate/router tests are stable.