The tag orchestra-conformance-v1 marks the full original lifecycle, live-proven by run 6. Both deployed halves sit there deliberately. The four plan-machinery commits above it pass build, vet and test, and have never run against a live agent. The handoff records what they need before they can: a verification policy on test-e2e, both halves rebuilt together, and F18 fixed first, since the burn-in will generate the retry loops it exists to make visible. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Claude-Session: https://claude.ai/code/session_01CVbaKucEYBjMqVeUgJUsc1
287 lines
13 KiB
Markdown
287 lines
13 KiB
Markdown
# Handoff: the lifecycle is proven and frozen, the plan machinery is written and unproven
|
|
|
|
Written 2026-08-28, 12:22 local (08:22 UTC). Read with `BURNIN.md` (the ledger,
|
|
current through F46 and run 6), `PLAN-SPEC-DESIGN.md` (the design this
|
|
implements), `HANDOFF-2026-08-28-burnin-5.md` (the session before this one),
|
|
`AUDIT.md` and `CLAUDE.md`.
|
|
|
|
Everything below was observed live unless it says otherwise.
|
|
|
|
## The headline
|
|
|
|
Two things happened, in this order, deliberately.
|
|
|
|
**The original Orchestra lifecycle is proven end to end and tagged.** Run 6
|
|
carried issue `kami/test-e2e#7` from creation to `TaskCompleted`. The chain
|
|
covered a real pull request, a trusted human rejection, a resubmission onto the
|
|
same pull request, and a merge. No manual lifecycle intervention.
|
|
|
|
**The plan machinery is written, tested, and deployed nowhere.** Four commits
|
|
sit above the tag. `go build`, `go vet` and `go test ./...` pass across 21
|
|
packages, and not one line of it has run against a live agent.
|
|
|
|
```text
|
|
orchestra-conformance-v1 full lifecycle proven, both halves deployed here
|
|
↓ four commits
|
|
HEAD plan.md + verified phase progress
|
|
+ policy-bounded verification + typed mismatch
|
|
```
|
|
|
|
## Deployed state
|
|
|
|
| Half | Revision | Evidence |
|
|
|---|---|---|
|
|
| Worker, workpc systemd | `063a3ab` | PID 3840261, sha256 `51321b93…`, verified from `/proc/<pid>/exe` |
|
|
| Coordinator, homesrv container | `4af9880` | `docker logs orchestra-api` prints the revision at startup |
|
|
|
|
Both are the tag. `063a3ab` contains `4af9880`: the two halves are one linear
|
|
history, and the later commits are worker-only.
|
|
|
|
**Verify the running worker, not the installed file.** This bit two sessions
|
|
ago, twice in one night. `sudo install` lands the new binary while the old
|
|
process keeps serving from the unlinked inode. Always
|
|
`sha256sum /proc/$(systemctl show -p MainPID --value orchestra-worker)/exe`.
|
|
|
|
`sudo` needs the operator in this sandbox. The worker deploy staging path is
|
|
`~/orchestra-deploy/orchestra-worker`, and it currently holds the same
|
|
`51321b93…` that is running.
|
|
|
|
## What run 6 proved
|
|
|
|
Task `06G4E6F69AKP2PA00S28D7ASBC`, issue `kami/test-e2e#7`, `workpc-claude`.
|
|
|
|
```text
|
|
06:41:14 TaskCreated issue #7 polled
|
|
06:41:37 frame -> research
|
|
06:42:57 research -> plan
|
|
06:45:12 plan -> implement
|
|
06:46:27 implement -> review
|
|
06:47:48 ReviewRecorded blocking 0, sha 41dee802
|
|
06:47:49 TaskSubmitted PR 8 opened
|
|
06:55:11 TaskChangesRequested trusted comment by kami
|
|
06:55:11 review -> implement
|
|
06:57:47 implement -> review
|
|
07:00:09 ReviewRecorded blocking 0, sha 0d1585df
|
|
07:00:09 TaskSubmitted PR 8 reused
|
|
07:02:07 merge by kami
|
|
07:02:11 TaskCompleted receipt binds merge f48e363d
|
|
```
|
|
|
|
Gate sha, review sha, submitted sha and the pull request head are one commit,
|
|
`0d1585df`. Each was checked against its artifact rather than its log line. The
|
|
full acceptance table is in `BURNIN.md` under "Run 6".
|
|
|
|
## The premise that was wrong
|
|
|
|
The previous handoff said submission, human review and merge needed
|
|
configuration rather than code. The event log held zero `ReviewRecorded` and
|
|
zero `TaskSubmitted` across its whole history. Nothing had ever called either
|
|
endpoint. Four defects, all live-proven and fixed:
|
|
|
|
- **F43**: the reviewed change had no path to the human. The worker completed
|
|
directly, and review, submission and the publisher had no live caller.
|
|
`e8d04d7`
|
|
- **F44**: the Gitea source ingested Orchestra's own pull request as a new task,
|
|
one per cycle, forever. `6ccc755`
|
|
- **F45**: the submission reflection loop was dead code, guarded on a map filled
|
|
600 lines later. A merge could never complete a task. `4af9880`
|
|
- **F46**: stale `review.json` survives a changes-requested round trip.
|
|
`063a3ab`
|
|
|
|
Plus `c11bf0e`, delivering a refusal to a reviewer whose findings file is
|
|
missing rather than retrying every five seconds into worker health.
|
|
|
|
The lesson worth carrying: **a documented endpoint is not a live call path.**
|
|
Grep for the caller before believing a feature exists. This is the third time
|
|
this repo has produced that failure.
|
|
|
|
## What the four new commits do
|
|
|
|
### `822f086`, research findings are citable
|
|
|
|
`Finding` gains `ID` and `Confidence` (`fact|inference|assumption`). The brief
|
|
at `agentctx.go` had advertised both for months while the struct dropped them
|
|
silently on every seal.
|
|
|
|
`DecodeStoredResearch` reads what is already in the CAS and backfills both,
|
|
labelling a backfilled finding `inference`. `DecodeResearch` stays strict for
|
|
new seals.
|
|
|
|
### `57c028f`, `plan.md`
|
|
|
|
Markdown, 128 KiB, no per-line cap, same seal path and same `PlanRef`. The old
|
|
artifact capped every entry at 500 single-line characters, which makes a
|
|
specification impossible.
|
|
|
|
The parser enforces required sections, contiguous phase numbering from 1,
|
|
`Files`/`Changes`/`Verification` per phase, and at least one check per phase.
|
|
`run:` lines are JSON argv arrays. Headings inside fenced blocks are content,
|
|
so a plan can show markdown without parsing its own example.
|
|
|
|
Citations resolve on the coordinator at seal time, the only party holding
|
|
`ResearchRef`.
|
|
|
|
**The property this exists for**: the plan renders byte for byte into the
|
|
implement launch. A rotated successor receives the same complete document.
|
|
`TestAcceptedPlanRendersVerbatim` and `TestRotatedSuccessorReceivesTheWholePlan`
|
|
guard it.
|
|
|
|
`DecodeStoredPlan` renders a legacy JSON plan into the same type, carrying zero
|
|
phases. The implement brief then says "legacy accepted plan, phase progress
|
|
unavailable" and the task continues under old semantics.
|
|
|
|
### `a221502`, progress Orchestra establishes
|
|
|
|
```text
|
|
agent may request: ready_for_verification
|
|
agent may not assert: verified, awaiting_manual_verification, failed, skipped
|
|
```
|
|
|
|
The worker resolves commands from the coordinator, never from the request. They
|
|
run as argv through `exec` with `Dir` set to the worktree, the quality gate's
|
|
existing envelope, with no shell.
|
|
|
|
`registry.Project.Verification` matches argv positionally. An absent policy
|
|
refuses everything: a plan command is agent-authored and must not inherit the
|
|
operator-authored gate's reach.
|
|
|
|
`PlanPhaseRecord` binds `plan_ref` and `at_sha`. Progress earned under plan A
|
|
cannot survive into plan B. A verified phase whose commit has moved renders as
|
|
stale rather than as a claim about the current tree.
|
|
|
|
Manual steps hold a phase at `awaiting_manual_verification`. The sign-off is an
|
|
ordinary human decision whose subject is
|
|
`plan_phase_verification:<plan_ref>:<phase_id>`, so a later "looks good" on an
|
|
unrelated thread cannot satisfy it.
|
|
|
|
### `c76112a`, typed mismatch
|
|
|
|
The report carries an observation and never a replacement plan.
|
|
`requested_action` is advisory.
|
|
|
|
The worker fills `plan_ref` and `at_sha` from what it can verify, so a stale
|
|
report is refused rather than replayed.
|
|
|
|
The distinction that matters in the reducer:
|
|
|
|
```text
|
|
mismatch recorded != plan superseded
|
|
```
|
|
|
|
A plan stops being accepted only when a replacement is sealed. An abandoned
|
|
replan leaves the accepted plan and its progress intact. On a real re-seal the
|
|
old ref moves to `PlanHistory` and its verification stays in the log as
|
|
provenance.
|
|
|
|
`human_decision` never reopens. It blocks with a packet, and a human answer can
|
|
resolve the contradiction without resealing anything.
|
|
|
|
`CanReopenPhase` is separate from `CanTransitionPhase`. Every path validating an
|
|
agent request uses the latter, so `phase-request.json` still refuses a backward
|
|
move.
|
|
|
|
## What the plan machinery needs before it can run
|
|
|
|
**Configuration, in two places.** The dual-config trap from run 6 applies here
|
|
too. It is worse for verification, because the worker is the half that
|
|
executes.
|
|
|
|
The coordinator's `config.jsonc` on homesrv
|
|
(`~/docker-apps/orchestra-web-ui/config.jsonc`) needs a `verification` block on
|
|
`test-e2e`:
|
|
|
|
```json
|
|
"verification": { "allowed": [["bash", "-n", "*"], ["bash", "scripts/orchestra_e2e_healthcheck.sh"]] }
|
|
```
|
|
|
|
`deploy/config.example.jsonc` documents the matcher rules. Absent policy refuses
|
|
every plan command, so without this a plan seals and then no phase can ever
|
|
verify.
|
|
|
|
**Operational invariant worth recording**: the worker-side project policy is
|
|
authoritative for execution, because the worker runs the verification. The
|
|
coordinator's copy is what `PlanPhaseCommands` authorises against. Today the
|
|
policy lives on `registry.Project`, which is the coordinator's copy only. The
|
|
worker's `/etc/orchestra/worker-projects.json` carries `quality_gate` and no
|
|
verification field. It does not need one: the worker asks the coordinator which
|
|
commands to run. Do not "fix" that by duplicating the policy.
|
|
|
|
**Both halves need rebuilding and redeploying together.** The four commits touch
|
|
`internal/domain`, `internal/store`, `internal/agentctx`, `internal/operations`,
|
|
`internal/registry`, `internal/federation`, `internal/workphase`, and both
|
|
binaries. A split deployment would have a worker calling
|
|
`/v1/federation/workers/<id>/plan-phase` against a coordinator that returns 404.
|
|
|
|
## The burn-in this needs
|
|
|
|
The proof ladder from `PLAN-SPEC-DESIGN.md` section 7, unchanged:
|
|
|
|
1. Plan seals three detailed phases. Implement launch contains the plan
|
|
verbatim. **Grep the rendered `launch.md` for the phase-three verification
|
|
command.** It is there or it is not.
|
|
2. Phase 1 requests verification. Worker runs the exact plan command. Durable
|
|
state says phase 1 verified.
|
|
3. Rotation. Successor receives the complete original plan, phase 1 verified,
|
|
phase 2 explicitly current.
|
|
4. Human correction lands above the plan.
|
|
5. Phase 2 hits a contradiction. Mismatch recorded, no improvisation, old plan
|
|
retained until the revised one seals, fresh launch carries the revised plan
|
|
in full.
|
|
|
|
Steps 1 and 3 are the rungs that matter for smaller local models.
|
|
|
|
Two more worth adding, from what this session found:
|
|
|
|
6. A plan whose commands fall outside project policy. The refusal must reach the
|
|
planner at seal time, not the implementer at verification time.
|
|
7. A legacy plan. The implement context must say phase progress is unavailable
|
|
and the task must still complete.
|
|
|
|
## Things that will bite
|
|
|
|
- **Verify the running worker binary, not the installed one.** `/proc/<pid>/exe`.
|
|
- **A documented endpoint is not a live call path.** Grep for the caller. F43,
|
|
F45, and the two before them were all this.
|
|
- **Gitea returns 422 for a review on your own pull request.** Orchestra opens
|
|
the pull request as the same forge user the operator reviews as. That makes
|
|
`REQUEST_CHANGES` unreachable in this deployment. The comment path works and
|
|
is what run 6 exercised. A separate bot account for `ORCHESTRA_GITEA_TOKEN`
|
|
would restore it.
|
|
- **`quality_gate` lives in two files.** `config.jsonc` on the coordinator and
|
|
`/etc/orchestra/worker-projects.json` on the worker. `finalize` reads the
|
|
worker copy. Verification policy is coordinator-only, deliberately.
|
|
- **Task `06G4E83E4KRXM8DS90M2648MGM` is blocked, deliberately.** It is the
|
|
task F44 spawned from Orchestra's own pull request. Its worktree and branch
|
|
are cleaned up. The task is left blocked on `operator_required` because it is
|
|
not real work. Fail it or leave it.
|
|
- **`rm` and `cp` are interactive in this shell.** A plain `rm` prompts, appears
|
|
to succeed, and leaves the file. Use `/bin/rm -f` and `install`.
|
|
- **Another session owns 13 uncommitted paths**, including `AUDIT.md`,
|
|
`deploy/build.sh`, `web/` and `AGENTS.md`. Commit by path. Never `git add -A`
|
|
without a pathspec.
|
|
- **Secrets are guarded.** Reading `.env` or `printenv` of a token through the
|
|
shell is blocked. The working recipe is expanding the token inside the
|
|
container in a single remote command.
|
|
- **`/tmp` is tmpfs with a 10-day sweep.** Check `/tmp/test-e2e` and
|
|
`/tmp/test-e2e-worktrees` exist before every run. Eight worktrees are there
|
|
now, most from completed tasks.
|
|
- **Rebuild the coordinator from a detached worktree, never
|
|
`docker compose build`.** The recipe is in `HANDOFF-2026-08-28-burnin-5.md`
|
|
and was used four times today without trouble.
|
|
|
|
## What I would do next, in order
|
|
|
|
1. **Fix F18.** Three more instances landed today: every refusal in the new plan
|
|
machinery records into the same single `last_error` slot. The bounded
|
|
observation ring is overdue. The plan burn-in will generate exactly the kind
|
|
of five-second retry loop it exists to make visible.
|
|
2. **Configure `test-e2e` verification policy** in the coordinator config.
|
|
3. **Rebuild and redeploy both halves at HEAD**, together.
|
|
4. **Run the seven-step ladder above.** Freeze the result as
|
|
`orchestra-plan-v1` if it passes.
|
|
5. Only then consider the Gitea bot account and the duplicated `quality_gate`
|
|
configuration. Both are real, neither blocks anything.
|
|
|
|
Do step 1 first. Steps 3 and 4 will produce failures whose only trace is
|
|
otherwise the journal.
|