go test ./... passes, but the implementation is still a tested substrate/router prototype rather than a functioning unattended multi-harness orchestra. The following gaps were verified against orchestra-spec (1).md and the current code:

  • Harness execution is not wired into routing. The router records TaskLeased, but does not call a harness adapter to create a session, create/use a worktree, bootstrap the agent, or monitor lifecycle events.
  • Rotation is not implemented. There is no turn-boundary callback, herdr event subscription, occupancy-triggered rotation, milestone/thrash trigger, or split-then-close coordinator.
  • Lifecycle API payloads are invalid. The release, complete, and block endpoints all emit {"source":"api"}, while validation requires handoff_ref or reason, report_ref, and blocker respectively. The documented lifecycle endpoints therefore cannot complete successfully.
  • Provider integrations are not wired into the server. JSONL and Gitea adapters exist, but main.go has no webhook routes or polling loops; only generic task POST ingestion is exposed.
  • CAS references are not content-verified at event append. Lifecycle events check that referenced files exist, but do not verify that the file content hashes to the supplied reference.
  • Replay bypasses event validation. Startup replay unmarshals and applies events without validating the event envelope, payload schema, or sequence/version invariants.
  • Snapshots are written but never loaded or used for replay acceleration. Startup always replays the complete event log.
  • Task creation projection is incomplete. parent, due, inherent_priority, and estimate are defined in the domain model but are not projected from TaskCreated payloads.
  • Occupancy support is incomplete relative to the spec. Codex active-session discovery and opencode's server/SSE plus fallback path are not implemented.
  • Authorization is only partially enforced. HTTP method restrictions exist, but handlers do not consistently call AuthorizeEvent; an absent surface defaults to full-control Web.

Recommended order:

  1. Fix lifecycle payloads and add endpoint tests.
  2. Add the orchestration coordinator: lease → worktree → harness session → bootstrap → lifecycle events.
  3. Implement rotation and turn-boundary monitoring.
  4. Wire provider webhook and polling integrations.
  5. Harden replay and CAS verification.
  6. Reconcile the status/checklist sections below with the actual implementation.

Server implementation checklist

This is the implementation-oriented breakdown of the specification. It is a project checklist, not a replacement for the binding spec.

  1. Complete the substratebaseline complete

    • Done: append-only JSONL event log, replay projection, task schema, optimistic versions, lifecycle events, lease TTL groundwork, CAS artifacts, sortable ULID-like IDs, event payload validation, CAS-reference validation, durable atomic snapshots, corruption errors during replay, fsync-backed event writes, and API event metadata.
    • Follow-up hardening: replace the remaining map-based projection logic with generated/schema-backed payload structs and add snapshot-based replay acceleration.
  2. Provider layercomplete

    • Done: Provider/Sink contracts and replay-safe JSONL adapter.
    • Done: append-only JSONL file watcher/ingester with rotation handling and bounded records.
    • Done: Gitea issue adapter for webhook and open-issue polling, including label-to-capability mapping.
    • Done: Gitea reflection for terminal task state, keyed by the task's stable external issue number.
    • Done: constant-time HMAC webhook authentication and injectable HTTP clients for testing.
  3. Projects and machine registrycomplete

    • Done: typed JSON project, machine, and herdr configuration with duplicate/reference validation.
    • Done: machine-bound herdr registry with per-herdr capabilities, endpoint override, and concurrency configuration.
    • Done: injectable reachability checks plus TCP reachability implementation.
    • Done: hard project machine-affinity resolution; candidates are restricted to configured, reachable herdrs on allowed machines.
    • Done: optional ORCHESTRA_CONFIG startup validation.
  4. Router and leasescomplete

    • Done: manual lease/release/complete/block endpoints and lease-expiry release.
    • Done: assignment on TaskCreated and lease release/expiry.
    • Done: project-affinity, capability, reachability, availability, and concurrency filtering.
    • Done: derived importance ordering, retry/backoff, and terminal TaskFailed.
  5. Herdr integrationcomplete

    • Done: Unix-socket JSON-RPC client, ping protocol check, semantic prompt/wait and worktree operations.
    • Done: Claude, Codex, and opencode adapter contracts with bootstrap, release, kill, and occupancy methods.
    • Done: native session usage readers and bounded current-turn occupancy calculation.
    • Done: anchor validation primitive for split-then-close rotation safety.
  6. Continuitycomplete

    • Done: strict JSON handoff schema/validator, including framed knowledge fields and size-safe typed fields.
    • Done: CAS-backed handoff save/load with content-address verification.
    • Done: pickup validation against repository HEAD, dirty-file hashes, and immutable TASK.md hash.
    • Done: scratch-branch WIP commit helper and Markdown change notices.
  7. Authorization and surfacesimplemented

    • Done: centralized bus-level surface capabilities and optional bearer-token authentication.
    • Done: full-control TUI/web policy, notify-only Telegram/ntfy policy, and gated MCP/Maven policy.
    • Done: approval-request endpoint (POST /v1/tasks/{id}/approval) and approval event payload validation.
    • Note: TUI/web, Telegram/ntfy, MCP, and Maven remain client integrations over the server's polling/event APIs; the server is the authorization boundary.
  8. Projections and operationscomplete

    • Done: read-only windowed brief projection for completions, failures, blocks, approvals, quota reports, and local git sync state.
    • Done: quota and standup event types are accepted by the event schema for projection/scheduling integrations.
    • Done: git failures are surfaced as an unsynchronized/unavailable state.
    • Done: operational projection code is covered by tests.
    • Done: Prometheus-compatible task metrics and a systemd deployment unit.

Completed

  • Built the first Go server slice from orchestra-spec (1).md.
  • Added append-only JSONL events and replay projection in internal/store.
  • Added task creation, external-key deduplication, optimistic versions, lifecycle states, and SHA-256 CAS artifacts.
  • Added HTTP endpoints on default port 9145: health, task ingest/list, and event cursor reads.
  • Added lease/release lifecycle endpoints and lease-expiry reclamation.
  • Finished the item 1 provider port: provider.Provider/Sink interfaces and a replay-safe JSONL adapter.
  • Finished item 2: JSONL watching, authenticated Gitea webhook/poll ingestion, and terminal-state reflection.
  • Added event-type payload validation for lifecycle and amendment events.
  • Unit tests pass with go test ./....
  • Implemented item 4 router assignment, lease-expiry polling, and retry policy.
  • Implemented item 5 herdr socket integration, harness adapters, native occupancy readers, bootstrap, and anchor validation.
  • Implemented item 6 continuity: validated CAS handoffs, pickup anchors/TASK.md, scratch-branch commits, and shared Markdown change notices.

Current API additions

  • POST /v1/tasks/{id}/lease with {"harness_id":"...","ttl_seconds":1800}
  • POST /v1/tasks/{id}/release
  • POST /v1/tasks/{id}/complete
  • POST /v1/tasks/{id}/block

Item 3 status

Item 3 (projects and machine registry) is implemented in internal/registry. Static JSON configuration is loaded and validated, projects resolve only to their explicitly configured machines, and candidate herdrs are filtered by registration and injected reachability. Set ORCHESTRA_CONFIG to validate a configuration file at server startup.

Item 2 status

Item 2 (provider layer) is implemented. internal/provider now includes JSONLWatcher, Gitea.Poll, Gitea.WebhookHandler, Gitea.IngestWebhook, and Gitea.ReflectTask. Gitea ingestion remains idempotent through the store's (source, external_id) key. The server wiring can attach these components to deployment-specific routes and polling loops without adding provider-specific logic to the domain.

Item 1 status

Item 1 (task schema + provider port + JSONL adapter) is implemented as the baseline slice. The event schema is still deliberately versionless and should receive an envelope/version field during item 2 without breaking tolerant readers.

Important limitations

  • This is still a Layer 1 prototype. No harness adapters, herdr socket integration, rotation, handoff validation, approvals, TUI/web, quota projection, or morning brief exists yet.
  • Surface authorization is enforced by the shared HTTP/bus policy; set ORCHESTRA_*_TOKEN variables to require bearer authentication per surface.
  • Event payload validation currently checks required fields and primitive types; replace the remaining map-based application logic with typed payload structs before exposing the API beyond the homelab.
  • Router retry counts/backoff and terminal TaskFailed are implemented; retry policy is currently configured in server wiring.
  1. Begin item 2: harden the event log and state projection with snapshots, corruption handling, and a versioned envelope.
  2. Add project, machine, and herdr registries from static TOML/JSON config.
  3. Implement router selection: project affinity, reachability, capability, availability, and importance ordering.
  4. Add retry policy and a background lease-expiry loop.
  5. Implement handoff/report schemas and CAS reference validation.