## Implementation review — 2026-07-26
`go test ./...` passes, but the implementation is still a tested substrate/router prototype rather than a functioning unattended multi-harness orchestra. The following gaps were verified against `orchestra-spec (1).md` and the current code:
- **Harness execution is not wired into routing.** The router records `TaskLeased`, but does not call a harness adapter to create a session, create/use a worktree, bootstrap the agent, or monitor lifecycle events.
- **Rotation is not implemented.** There is no turn-boundary callback, herdr event subscription, occupancy-triggered rotation, milestone/thrash trigger, or split-then-close coordinator.
- **Lifecycle API payloads are invalid.** The release, complete, and block endpoints all emit `{"source":"api"}`, while validation requires `handoff_ref` or `reason`, `report_ref`, and `blocker` respectively. The documented lifecycle endpoints therefore cannot complete successfully.
- **Provider integrations are not wired into the server.** JSONL and Gitea adapters exist, but `main.go` has no webhook routes or polling loops; only generic task POST ingestion is exposed.
- **CAS references are not content-verified at event append.** Lifecycle events check that referenced files exist, but do not verify that the file content hashes to the supplied reference.
- **Replay bypasses event validation.** Startup replay unmarshals and applies events without validating the event envelope, payload schema, or sequence/version invariants.
- **Snapshots are written but never loaded or used for replay acceleration.** Startup always replays the complete event log.
- **Task creation projection is incomplete.** `parent`, `due`, `inherent_priority`, and `estimate` are defined in the domain model but are not projected from `TaskCreated` payloads.
- **Occupancy support is incomplete relative to the spec.** Codex active-session discovery and opencode's server/SSE plus fallback path are not implemented.
- **Authorization is only partially enforced.** HTTP method restrictions exist, but handlers do not consistently call `AuthorizeEvent`; an absent surface defaults to full-control Web.
Recommended order:
1. Fix lifecycle payloads and add endpoint tests.
2. Add the orchestration coordinator: lease → worktree → harness session → bootstrap → lifecycle events.
3. Implement rotation and turn-boundary monitoring.
4. Wire provider webhook and polling integrations.
5. Harden replay and CAS verification.
6. Reconcile the status/checklist sections below with the actual implementation.
## Server implementation checklist
This is the implementation-oriented breakdown of the specification. It is a project checklist, not a replacement for the binding spec.
1. **Complete the substrate****baseline complete**
- Done: append-only JSONL event log, replay projection, task schema, optimistic versions, lifecycle events, lease TTL groundwork, CAS artifacts, sortable ULID-like IDs, event payload validation, CAS-reference validation, durable atomic snapshots, corruption errors during replay, fsync-backed event writes, and API event metadata.
- Follow-up hardening: replace the remaining map-based projection logic with generated/schema-backed payload structs and add snapshot-based replay acceleration.
2. **Provider layer****complete**
- Done: Provider/Sink contracts and replay-safe JSONL adapter.
- Done: append-only JSONL file watcher/ingester with rotation handling and bounded records.
- Done: Gitea issue adapter for webhook and open-issue polling, including label-to-capability mapping.
- Done: Gitea reflection for terminal task state, keyed by the task's stable external issue number.
- Done: constant-time HMAC webhook authentication and injectable HTTP clients for testing.
3. **Projects and machine registry****complete**
- Done: typed JSON project, machine, and herdr configuration with duplicate/reference validation.
- Done: machine-bound herdr registry with per-herdr capabilities, endpoint override, and concurrency configuration.
- Done: injectable reachability checks plus TCP reachability implementation.
- Done: hard project machine-affinity resolution; candidates are restricted to configured, reachable herdrs on allowed machines.
- Done: optional `ORCHESTRA_CONFIG` startup validation.
4. **Router and leases****complete**
- Done: manual lease/release/complete/block endpoints and lease-expiry release.
- Done: assignment on `TaskCreated` and lease release/expiry.
- Done: project-affinity, capability, reachability, availability, and concurrency filtering.
- Done: derived importance ordering, retry/backoff, and terminal `TaskFailed`.
5. **Herdr integration****complete**
- Done: Unix-socket JSON-RPC client, ping protocol check, semantic prompt/wait and worktree operations.
- Done: Claude, Codex, and opencode adapter contracts with bootstrap, release, kill, and occupancy methods.
- Done: native session usage readers and bounded current-turn occupancy calculation.
- Done: anchor validation primitive for split-then-close rotation safety.
6. **Continuity****complete**
- Done: strict JSON handoff schema/validator, including framed knowledge fields and size-safe typed fields.
- Done: CAS-backed handoff save/load with content-address verification.
- Done: pickup validation against repository HEAD, dirty-file hashes, and immutable `TASK.md` hash.
- Done: scratch-branch WIP commit helper and Markdown change notices.
7. **Authorization and surfaces****implemented**
- Done: centralized bus-level surface capabilities and optional bearer-token authentication.
- Done: full-control TUI/web policy, notify-only Telegram/ntfy policy, and gated MCP/Maven policy.
- Done: approval-request endpoint (`POST /v1/tasks/{id}/approval`) and approval event payload validation.
- Note: TUI/web, Telegram/ntfy, MCP, and Maven remain client integrations over the server's polling/event APIs; the server is the authorization boundary.
8. **Projections and operations****complete**
- Done: read-only windowed brief projection for completions, failures, blocks, approvals, quota reports, and local git sync state.
- Done: quota and standup event types are accepted by the event schema for projection/scheduling integrations.
- Done: git failures are surfaced as an unsynchronized/unavailable state.
- Done: operational projection code is covered by tests.
- Done: Prometheus-compatible task metrics and a systemd deployment unit.
## Completed
- Built the first Go server slice from `orchestra-spec (1).md`.
- Added append-only JSONL events and replay projection in `internal/store`.
- Added task creation, external-key deduplication, optimistic versions, lifecycle states, and SHA-256 CAS artifacts.
- Added HTTP endpoints on default port `9145`: health, task ingest/list, and event cursor reads.
- Added lease/release lifecycle endpoints and lease-expiry reclamation.
- Finished the item 1 provider port: `provider.Provider`/`Sink` interfaces and a replay-safe JSONL adapter.
- Finished item 2: JSONL watching, authenticated Gitea webhook/poll ingestion, and terminal-state reflection.
- Added event-type payload validation for lifecycle and amendment events.
- Unit tests pass with `go test ./...`.
- Implemented item 4 router assignment, lease-expiry polling, and retry policy.
- Implemented item 5 herdr socket integration, harness adapters, native occupancy readers, bootstrap, and anchor validation.
- Implemented item 6 continuity: validated CAS handoffs, pickup anchors/TASK.md, scratch-branch commits, and shared Markdown change notices.
## Current API additions
- `POST /v1/tasks/{id}/lease` with `{"harness_id":"...","ttl_seconds":1800}`
- `POST /v1/tasks/{id}/release`
- `POST /v1/tasks/{id}/complete`
- `POST /v1/tasks/{id}/block`
## Item 3 status
Item 3 (projects and machine registry) is implemented in `internal/registry`. Static JSON configuration is loaded and validated, projects resolve only to their explicitly configured machines, and candidate herdrs are filtered by registration and injected reachability. Set `ORCHESTRA_CONFIG` to validate a configuration file at server startup.
## Item 2 status
Item 2 (provider layer) is implemented. `internal/provider` now includes `JSONLWatcher`, `Gitea.Poll`, `Gitea.WebhookHandler`, `Gitea.IngestWebhook`, and `Gitea.ReflectTask`. Gitea ingestion remains idempotent through the store's `(source, external_id)` key. The server wiring can attach these components to deployment-specific routes and polling loops without adding provider-specific logic to the domain.
## Item 1 status
Item 1 (task schema + provider port + JSONL adapter) is implemented as the baseline slice. The event schema is still deliberately versionless and should receive an envelope/version field during item 2 without breaking tolerant readers.
## Important limitations
- This is still a Layer 1 prototype. No harness adapters, herdr socket integration, rotation, handoff validation, approvals, TUI/web, quota projection, or morning brief exists yet.
- Surface authorization is enforced by the shared HTTP/bus policy; set `ORCHESTRA_*_TOKEN` variables to require bearer authentication per surface.
- Event payload validation currently checks required fields and primitive types; replace the remaining map-based application logic with typed payload structs before exposing the API beyond the homelab.
- Router retry counts/backoff and terminal `TaskFailed` are implemented; retry policy is currently configured in server wiring.
## Next agent: recommended order
1. Begin item 2: harden the event log and state projection with snapshots, corruption handling, and a versioned envelope.
2. Add project, machine, and herdr registries from static TOML/JSON config.
3. Implement router selection: project affinity, reachability, capability, availability, and importance ordering.
4. Add retry policy and a background lease-expiry loop.
5. Implement handoff/report schemas and CAS reference validation.
6. Integrate herdr only after the substrate/router tests are stable.